Search results

Jump to: navigation, search
  • ...the banks initially moved quite rapidly with a speed of up to 6 meters per year. It is expected that the bank erosion will eventually slow down and become The total monitoring costs of the entire NVO project 141.000 euro/year
    9 KB (1,313 words) - 11:22, 28 June 2010
  • Within a four year monitoring period, channel morphology consistently changed, depth variabili
    5 KB (667 words) - 15:34, 27 May 2014
  • ...ee that is closer to the river. There is other levee that protects the 500-year flood, but it will be preserved. This actuation will increase the lateral c
    4 KB (575 words) - 10:56, 24 May 2010
  • ...eople directly, the production of sand and kaolin reaches 300.000 tons per year.<br />
    12 KB (1,799 words) - 15:35, 8 June 2010
  • The monitoring was planned for 1 year and 2 years after restoration. More long term monitoring was not planned du ...ophyte species richness increased above pre-restoration levels with 30%, a year after restoration. The downstream control site did not seem to be affected
    11 KB (1,656 words) - 13:52, 30 July 2013
  • ...Large parts of the site are stagnant during shorter or longer parts of the year. ! width="40%" | Sample year(s)
    10 KB (1,428 words) - 16:06, 28 June 2010
  • ...ion increase. These two species are mainly represented in juveniles of the year. Accordingly, this result should be interpreted in this context and in pers ...steadily chronic since 1995 and physical chemistry measurements made every year since 1995 to 1999. Biology is approached by two compartments. Electric fis
    21 KB (2,777 words) - 11:43, 1 June 2010
  • ...ol from the river. On average the pool is inundated more then 100 days per year. This leads to sedimentation of the pool.
    7 KB (1,038 words) - 12:35, 17 December 2010
  • ...charge in 1 Hm<sup>3</sup>/year, and the extractions in 7,5 Hm<sup>3</sup>/year (1997)<ref>DGOHCA-ITGE (1997). Catálogo de acuíferos con problemas de sob
    15 KB (2,302 words) - 12:31, 8 June 2010
  • :* One year after restoration,the percentage of dead stakes of the buffer strip was low
    5 KB (751 words) - 18:05, 20 May 2010
  • ...es diversity at the site increased from 48 species to 100 species. Another year later the species diversity had increased to 118 species in total. A form o
    9 KB (1,387 words) - 12:27, 29 July 2010
  • ...akes place at a rate which is fairly standard for Waal floodplains (1-2 cm/year). This sedimentation may become a problem in time. To avoid this plans are
    9 KB (1,252 words) - 12:30, 29 July 2010
  • ...ead lime further downstream to the waters of Moälven River throughout the year. Besides, a liming facility was installed consisting of a silo with a capac
    11 KB (1,677 words) - 17:21, 1 September 2011
  • ...trient load was reduced with more than 200 tones of nitrogen per hectare a year. Back to their natural functioning, the restored wetlands are now able to ...ong the Skjern River were beneficial at an interest of 5 % or less on a 20 year time scale, and on an infinite time scale even at 7 %, i.e. a good public i
    22 KB (3,197 words) - 13:58, 16 December 2015
  • ...uncommon taxa related to more mature habitats were not present yet after 1 year. Two new species were found in the restored Cole, one stonefly (Leuctra gen For '''Birds''', the number of breeding wetland species did not increase 1 year after restoration. The abundance of Yellow Wagtails (Motacilla flava) incre
    10 KB (1,391 words) - 08:57, 2 August 2013
  • In the 18th century, the Pannerdensch canal was dug to facilitate year-round shipping. By law, the river minimally receives 1/9th of the total Rhi ...by the road to the local ferry. The area will be maintained by mowing 4x a year and extensive grazing.
    10 KB (1,402 words) - 12:53, 1 August 2013
  • Physical and biological monitoring of STREAM restoration projects: Year three report
    12 KB (1,759 words) - 12:13, 2 August 2013
  • ...cal flooding was introduced to restore the flood plain nature. 65 days per year river water is allowed to enter Polder Altenheim. It is now one of the olde ...inlet. These inlets are designed to flood parts of the polders 65 days per year. When there is a higher discharge of once per 10 years, the polders will au
    7 KB (940 words) - 20:30, 6 August 2013
  • ...port ‘Physical and biological monitoring of STREAM restoration projects: Year three report’ Physical and biological monitoring of STREAM restoration projects: Year three report
    13 KB (1,890 words) - 13:56, 2 August 2013
  • ...t known because the latest found monitoring report was from 2011, the same year the Obergottesfeld project was finished. It is known that the flow velocity
    6 KB (798 words) - 22:24, 6 August 2013
  • ...a type-specific macrophyte community including rheophil species within one year after implementation of the project (Grünert et al. 2007). The macrophyte ...f rheophil species than of the presence of limnophil species. However, one year after the reconnection of the meander, no significant differences in the in
    16 KB (2,252 words) - 15:13, 16 December 2015
  • ...of the Kuivajoki river and to enable the migration of fish throughout the year. ...ncy 7/13) were caught. However, all salmon individuals were older than one year and the age class 0+ was missing, indicating that natural breeding may not
    8 KB (1,071 words) - 12:12, 16 December 2015
  • ...ty (78%) of the local inhabitants visit the river at least several times a year, several even daily (22%). The most common activities were bird or animal w
    10 KB (1,466 words) - 10:20, 16 December 2015
  • ...ng at the site less than a month after the opening of the dam lids but one year later high numbers of salmon and trout could be caught at the site. Densiti ...rout were caught by electrofishing at the site before the restoration. One year after the restoration a few young salmon but no trout could be caught at th
    21 KB (3,230 words) - 15:09, 10 June 2015
  • ...tural channel between 1 April and 15 November. During the remainder of the year a minimum flow of 0.5 m3/s should be directed through the fishways and the ...he fishways at Marieberg and at Hemsjö övre has revealed that in a given year on average ca. 50 % of the salmon and trout that pass through the fishway a
    33 KB (4,894 words) - 13:46, 16 December 2015
  • ...the south part of the area functions satisfactory in the cold part of the year. In summer and autumn, the volume of water diverted into old arms is not su ...re are some problems in the south part of the site in the warm part of the year (see Hydrological regime).
    12 KB (1,742 words) - 13:03, 27 May 2014
  • Not available (the project seems not have any sustaining after year 2009) ...n of old ornithological values in the municipalities of Ląd and Zagorów,(Year I - 2009) [in Polish]
    7 KB (1,005 words) - 10:01, 17 December 2015
  • ...s hopefully ready sometime by the end of the summer maybe the end of the year I don't know more translated versions coming soon the next big piece of n
    36 KB (6,841 words) - 09:58, 11 March 2019
  • ...trient load was reduced with more than 200 tones of nitrogen per hectare a year. Back to their natural functioning, the restored wetlands are now able to ...ong the Skjern River were beneficial at an interest of 5 % or less on a 20 year time scale, and on an infinite time scale even at 7 %, i.e. a good public i
    22 KB (3,197 words) - 14:05, 16 December 2015
  • ...trient load was reduced with more than 200 tones of nitrogen per hectare a year. Back to their natural functioning, the restored wetlands are now able to ...ong the Skjern River were beneficial at an interest of 5 % or less on a 20 year time scale, and on an infinite time scale even at 7 %, i.e. a good public i
    22 KB (3,197 words) - 14:14, 16 December 2015
  • ...(average) current velocity near the river bottom of 0.3-0.4 m/s during the year (Waterschap de Dommel, 2007).
    7 KB (1,029 words) - 09:46, 17 December 2015
  • Not available (the project seems not have any sustaining after year 2009) ...n of old ornithological values in the municipalities of Ląd and Zagorów,(Year I - 2009) [in Polish]
    7 KB (1,005 words) - 09:59, 17 December 2015
  • ...dent around the world, and Australia is among their victim. In the fiscal year covering 2016-2017, “ill health or the lack of insurance” is cited as t
    3 KB (537 words) - 09:58, 30 July 2018

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)