Difference between revisions of "Bemmelse Waard – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)"

From REFORM wiki
Jump to: navigation, search
(New page: =Bemmelse Waard – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)= <googlemap version="0.9" lat="" lon="" zoom="13" width="100%" height="400" scale="yes" ...)
 
(Bemmelse Waard – Restoring former floodplains (INTERREG Sustainable Development of Floodplains))
Line 1: Line 1:
 
=Bemmelse Waard – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)=
 
=Bemmelse Waard – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)=
  
<googlemap version="0.9" lat="" lon="" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">
+
<googlemap version="0.9" lat="51.874159" lon="5.963173" scale="yes" overview="yes" controls="large">
(A) , </googlemap>  
+
51.878822, 5.907898
 +
</googlemap>
 +
 
  
 
<Forecasterlink type="getProjectInfoBox" code="217" />
 
<Forecasterlink type="getProjectInfoBox" code="217" />

Revision as of 14:07, 19 July 2011

Bemmelse Waard – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)


Factsheet: Bemmelse Waard – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)

General
Country NL
River Name Rhine River
Site Name Bemmelse Waard – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)
River Characterisation
    River typology
    Location (Lat Lon) 51.868436, 5.973816
    Altitude lowland: < 200 m
    Catchment area very large: > 10000 km2
    Geology Siliceous
    National code/
    River type name
    Hydromorphological quality elements

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size 400 ha
    Approximate costs > 1 000 000 Euros
    Synergy
    Status Realised
    Period of realization 2003 -2008
    Evaluation None
    Implemented by Dienst Landelijk Gebied-Regio Oost


    Key features of the case study

    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

    Related Pressures