Ems floodplain (LIFE project)

From REFORM wiki
Revision as of 10:11, 12 April 2010 by IGBBerlin (Talk | contribs)

Jump to: navigation, search

Ems floodplain (LIFE project)


Factsheet: Ems floodplain (LIFE project)

General
Country DE
River Name Ems
Site Name Ems floodplain (LIFE project)
River Characterisation
    River typology
    Location (Lat Lon) 52.3774985682202, 7.33646392822266
    Altitude lowland: < 200 m
    Catchment area large: > 1000 - 10000 km2
    Geology Siliceous
    National code/
    River type name
    Type 15
    Hydromorphological quality elements

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size 20.2 km
    Approximate costs > 1 000 000 Euros
    Synergy
    Status Realised
    Period of realization 2004-2008
    Evaluation
    Implemented by Landkreis Emsland, www.emsland.de


    Key features of the case study

    The Ems is a large sand-bed river and its floodplains were deforested and used for agriculture purpose. The district Emsland has carried out a LIFE project to restore the Ems floodplains: "naturnahe Flussdynamik an der niedersächsischen Ems" (natural river dynamics in the Ems in Lower Saxony). For more information see the website in German: http://www.ems-life.de/

    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

    Related Pressures