(New page: =Niederwerrieser Weg - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)= <googlemap version="0.9" lat="51.6990550954649" lon="7.875266075134...)
 
(Niederwerrieser Weg - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057))
Line 1: Line 1:
 
=Niederwerrieser Weg - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)=
 
=Niederwerrieser Weg - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)=
  
<googlemap version="0.9" lat="51.6990550954649" lon="7.87526607513428" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">
+
<googlemap version="0.9" lat="51.700638" lon="7.872047" zoom="16" scale="yes" overview="yes" controls="large">
(A) 51.6990550954649, 7.87526607513428</googlemap>  
+
51.699534, 7.875481
 +
River bank renaturation
 +
51.701156, 7.872927
 +
Blocking of drainage ditches
 +
</googlemap>
  
 
<Forecasterlink type="getProjectInfoBox" code="226" />
 
<Forecasterlink type="getProjectInfoBox" code="226" />

Revision as of 16:04, 25 July 2011

Niederwerrieser Weg - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)


Factsheet: Niederwerrieser Weg - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)

General
Country DE
River Name Lippe
Site Name Niederwerrieser Weg - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)
River Characterisation
    River typology
    Location (Lat Lon) 51.6990550954649, 7.87526607513428
    Altitude lowland: < 200 m
    Catchment area large: > 1000 - 10000 km2
    Geology Calcareous
    National code/
    River type name
    Hydromorphological quality elements

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size -1
    Approximate costs > 1 000 000 Euros
    Synergy
    Status Realised
    Period of realization 2006 - 2010
    Evaluation Ecological change
    Implemented by Stadt Hamm, Umweltamt


    Key features of the case study

    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

    Related Pressures