Polder Ingelheim – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)

From REFORM wiki
Revision as of 12:54, 19 July 2011 by Avarello (Talk | contribs)

Jump to: navigation, search

Polder Ingelheim – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)


Factsheet: Polder Ingelheim – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)

General
Country DE
River Name Rhine River
Site Name Polder Ingelheim – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)
River Characterisation
    River typology
    Location (Lat Lon) 48.5747899109289, 5.47119140625
    Altitude lowland: < 200 m
    Catchment area very large: > 10000 km2
    Geology Siliceous
    National code/
    River type name
    Hydromorphological quality elements

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size 160 ha
    Approximate costs > 1 000 000 Euros
    Synergy
    Status Realised
    Period of realization 2004-2008
    Evaluation None
    Implemented by SGD-Süd Rheinland Pfalz (state of Rhineland-Palatinate)


    Key features of the case study

    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

    Related Pressures