Difference between revisions of "Template factsheet"

From REFORM wiki
Jump to: navigation, search
 
(19 intermediate revisions by the same user not shown)
Line 1: Line 1:
= Factsheet of case study =
+
= Information contained in the factsheet for a case study =
  
{|
+
== Field name: ==
|  [[Image:iwrm-hau_gauche.gif|200px]]    ||  [[Image:Delft-Cluster-logo.jpg|200px]]
+
|-
+
|  a    ||  b
+
|-
+
  
 +
* Country
 +
* River Name
 +
* Site Name
 +
* River typology
 +
* National code and River type name
 +
* Hydromorphological quality elements
 +
* Biological quality elements
 +
* Pressures
 +
* Measures
 +
* Project size
 +
* Approximate costs
 +
* Synergy
 +
* Status
 +
* Period of realization
 +
* Evaluation
 +
* Implemented by
  
|}
 
  
 +
== Field description: ==
  
* Site name:
 
 
 
 
* Country:
 
* Country:
 +
-> Select from the list of countries of the world
  
 
* River Name:
 
* River Name:
 +
-> Name of the river where the project is implemented 
 
   
 
   
 
* Site Name:  
 
* Site Name:  
 +
-> Indicative name for the particular location of the project
  
* River typology: from WFD classification for European water bodies
+
* River typology:  
** Location (Latitude and Longitude, or click on the Google map)
+
-> Select according to WFD classification for European water bodies (see [[ River Typology|River_typology]])
** Altitude   
+
1 Location  
** Catchment area
+
1.1 Latitude  
** Geology  
+
1.2 Longitude  
 +
2 Altitude  
 +
  2.1 high: > 800 m
 +
2.2 mid-altitude: 200 to 800 m
 +
2.3 lowland: < 200 m
 +
3 Catchment area
 +
3.1 small: 10 to 100 km<sup>2</sup>
 +
3.2 medium: >100 to 1000 km<sup>2</sup>
 +
3.3 large: >1000 to 10 000 km<sup>2</sup>
 +
3.4 very large: > 10 000 km<sup>2</sup>
 +
4 Geology  
 +
4.1 calcareous
 +
4.2 siliceous
 +
4.3 organic
  
 
* National code and River type name:  
 
* National code and River type name:  
 +
-> According to national river typology
  
 
* Hydromorphological quality elements:  
 
* Hydromorphological quality elements:  
  -> select from list:  
+
  -> select from list: (see [[HYMOQE|HYMOQE]])
 
  1 Hydrological regime
 
  1 Hydrological regime
 
  1.1 Quantity and dynamics of water flow
 
  1.1 Quantity and dynamics of water flow
Line 41: Line 68:
  
 
* Biological quality elements:  
 
* Biological quality elements:  
  -> Select from list:
+
  -> Select from list: (see [[BQE|BQE]])
 
  1 Phytoplankton
 
  1 Phytoplankton
 
  2 Macrophytes and phytobenthos
 
  2 Macrophytes and phytobenthos
Line 48: Line 75:
  
 
* Pressures:  
 
* Pressures:  
  -> Select from list:  
+
  -> Select from list: (see [[Pressures|Pressures]])
1 Water abstractions
+
1 Water abstractions
1.1 Surface water abstraction
+
1.1 Surface water abstraction
1.2 Groundwater abstractions
+
1.2 Groundwater abstractions
2 Flow regulations
+
2 Flow regulations
 
   2.1 Discharge diversions and returns
 
   2.1 Discharge diversions and returns
 
   2.2 Interbasin flow transfers
 
   2.2 Interbasin flow transfers
Line 59: Line 86:
 
   2.5 Reservoir flushing
 
   2.5 Reservoir flushing
 
   2.6 Sediment discharge from dredging
 
   2.6 Sediment discharge from dredging
3 River fragmentation
+
3 River fragmentation
 
   3.1 Artificial barriers upstream from the site
 
   3.1 Artificial barriers upstream from the site
 
   3.2 Artificial barriers downstream from the site
 
   3.2 Artificial barriers downstream from the site
 
   3.3 Colinear connected reservoir
 
   3.3 Colinear connected reservoir
4 Morphological alterations
+
4 Morphological alterations
 
   4.1 Impoundment
 
   4.1 Impoundment
 
   4.2 Channelisation / cross section alteration
 
   4.2 Channelisation / cross section alteration
Line 72: Line 99:
 
   4.7 Sand and gravel extraction
 
   4.7 Sand and gravel extraction
 
   4.8 Loss of vertical connectivity
 
   4.8 Loss of vertical connectivity
5 Other hydromorphological pressures
+
5 Other hydromorphological pressures
 
   5.1 Other pressures
 
   5.1 Other pressures
  
  
 
* Measures:  
 
* Measures:  
  -> Select from list:
+
  -> Select from list: (see [[Measures|Measures]])
1 Water flow quantity improvement
+
1 Water flow quantity improvement
 
   01.1 Reduce surface water abstraction without return
 
   01.1 Reduce surface water abstraction without return
 
   01.2 Reduce surface water abstraction with return
 
   01.2 Reduce surface water abstraction with return
Line 88: Line 115:
 
   01.8 Recycle used water
 
   01.8 Recycle used water
 
   01.9 Reduce water consumption
 
   01.9 Reduce water consumption
2 Sediment flow quantity improvement
+
2 Sediment flow quantity improvement
 
   02.1 Add/feed sediment
 
   02.1 Add/feed sediment
 
   02.2 Reduce undesired sediment input
 
   02.2 Reduce undesired sediment input
Line 96: Line 123:
 
   02.6 Manage dams for sediment flow
 
   02.6 Manage dams for sediment flow
 
   02.7 Trap sediments
 
   02.7 Trap sediments
3 Flow dynamics improvement
+
3 Flow dynamics improvement
 
   03.1 Ensure minimum flows
 
   03.1 Ensure minimum flows
 
   03.2 Establish environmental flows / naturalise flow regimes
 
   03.2 Establish environmental flows / naturalise flow regimes
Line 106: Line 133:
 
   03.8 Link flood reduction with ecological restoration
 
   03.8 Link flood reduction with ecological restoration
 
   03.9 Manage aquatic vegetation
 
   03.9 Manage aquatic vegetation
4 Longitudinal connectivity improvement
+
4 Longitudinal connectivity improvement
 
   04.1 Remove barrier
 
   04.1 Remove barrier
 
   04.2 Install fish pass/bypass/side channel for upstream migration
 
   04.2 Install fish pass/bypass/side channel for upstream migration
Line 113: Line 140:
 
   04.5 Manage sluice and weir operation for fish migration
 
   04.5 Manage sluice and weir operation for fish migration
 
   04.6 Fish-friendly turbines and pumping stations
 
   04.6 Fish-friendly turbines and pumping stations
5 River bed depth and width variation improvement
+
5 River bed depth and width variation improvement
 
   05.1 Remeander water courses
 
   05.1 Remeander water courses
 
   05.2 Widen water courses
 
   05.2 Widen water courses
Line 120: Line 147:
 
   05.5 Narrow water courses
 
   05.5 Narrow water courses
 
   05.6 Create low flow channels in over-sized channels
 
   05.6 Create low flow channels in over-sized channels
6 In-channel structure and substrate improvement
+
6 In-channel structure and substrate improvement
 
   06.1 Initiate natural channel dynamics to promote natural regeneration
 
   06.1 Initiate natural channel dynamics to promote natural regeneration
 
   06.2 Remove sediments
 
   06.2 Remove sediments
Line 130: Line 157:
 
   06.8 Remove or modify in-channel hydraulic structures
 
   06.8 Remove or modify in-channel hydraulic structures
 
   06.9 Reduce impact of dredging
 
   06.9 Reduce impact of dredging
7 Riparian zone improvement
+
7 Riparian zone improvement
 
   07.1 Adjust land use to develop riparian vegetation
 
   07.1 Adjust land use to develop riparian vegetation
 
   07.2 Revegetate riparian zones
 
   07.2 Revegetate riparian zones
Line 137: Line 164:
 
   07.5 Adjust land use to reduce nutrient, sediment input or shore erosion
 
   07.5 Adjust land use to reduce nutrient, sediment input or shore erosion
 
   07.6 Develop riparian forest
 
   07.6 Develop riparian forest
8 Floodplains/off-channel/lateral connectivity habitats improvement
+
8 Floodplains/off-channel/lateral connectivity habitats improvement
 
   08.1 Lower river banks or floodplains to enlarge inundation and flooding
 
   08.1 Lower river banks or floodplains to enlarge inundation and flooding
 
   08.2 Set back embankments, levees or dikes
 
   08.2 Set back embankments, levees or dikes
Line 147: Line 174:
 
   08.8 Construct semi-natural/articificial wetlands or aquatic habitats
 
   08.8 Construct semi-natural/articificial wetlands or aquatic habitats
 
   08.9 Isolation of water bodies
 
   08.9 Isolation of water bodies
9 Other aims to improve hydrological or morphological conditions
+
9 Other aims to improve hydrological or morphological conditions
 
   09.1 Other measures
 
   09.1 Other measures
  
* Project size (length or area):
+
* Project size:
 +
-> Length or area of the works and/or rehabilitation activities
  
* Approximate costs (Euros):  
+
* Approximate costs:  
 
  -> Select from list:
 
  -> Select from list:
** < 10 000 Euros
+
1 < 10 000 Euros
** > 10 000 - < 100 000
+
2 > 10 000 - < 100 000 Euros
** > 100 000 - < 1 000 000
+
3 > 100 000 - < 1 000 000 Euros
** > 1 000 000
+
4 > 1 000 000 Euros
  
 
* Synergy:  
 
* Synergy:  
 +
-> Indicate interaction with other objectives: e.g. flood protection, recreation, etc.
  
 
* Status:  
 
* Status:  
 
  -> Select from list:  
 
  -> Select from list:  
** Planned  
+
1 Planned  
** Realised
+
2 In progress
 +
3 Realised
  
 
* Period of realization:  
 
* Period of realization:  
 +
-> Period in years during which the project was implemented
  
 
* Evaluation:
 
* Evaluation:
 
  -> Select from list:
 
  -> Select from list:
** Hydromorphological  
+
1 Hydromorphological  
** Ecological changes
+
2 Ecological changes
** Hydromorphological and ecological changes
+
3 Hydromorphological and ecological changes
** None
+
4 None
  
 
* Implemented by:  
 
* Implemented by:  
 
  -> Institution responsible for the implementation
 
  -> Institution responsible for the implementation

Latest revision as of 13:00, 20 June 2010

Information contained in the factsheet for a case study

Field name:

  • Country
  • River Name
  • Site Name
  • River typology
  • National code and River type name
  • Hydromorphological quality elements
  • Biological quality elements
  • Pressures
  • Measures
  • Project size
  • Approximate costs
  • Synergy
  • Status
  • Period of realization
  • Evaluation
  • Implemented by


Field description:

  • Country:
-> Select from the list of countries of the world 
  • River Name:
-> Name of the river where the project is implemented  

  • Site Name:
-> Indicative name for the particular location of the project 
  • River typology:
-> Select according to WFD classification for European water bodies (see River_typology)
1 Location 
1.1 Latitude 
1.2 Longitude 
2 Altitude 
2.1 high: > 800 m
2.2 mid-altitude: 200 to 800 m
2.3 lowland: < 200 m 
3 Catchment area
3.1 small: 10 to 100 km2
3.2 medium: >100 to 1000 km2
3.3 large: >1000 to 10 000 km2
3.4 very large: > 10 000 km2
4 Geology	 
4.1 calcareous
4.2 siliceous
4.3 organic
  • National code and River type name:
-> According to national river typology 
  • Hydromorphological quality elements:
-> select from list: (see HYMOQE) 
1 Hydrological regime
1.1 Quantity and dynamics of water flow
1.2 Connection to groundwater bodies
2 River continuity
2.1 River continuity
3 Morphological conditions
3.1 River depth and width variation
3.2 Structure and substrate of the river bed
3.3 Structure of the riparian zone
3.4 Structure of the floodplain
  • Biological quality elements:
-> Select from list: (see BQE)
1 Phytoplankton
2 Macrophytes and phytobenthos
3 Benthic invertebrates
4 Fish
  • Pressures:
-> Select from list: (see Pressures)
1 Water abstractions
1.1 Surface water abstraction
1.2 Groundwater abstractions
2 Flow regulations
 2.1 Discharge diversions and returns
 2.2 Interbasin flow transfers
 2.3 Hydrological regime modification
 2.4 Hydropeaking
 2.5 Reservoir flushing
 2.6 Sediment discharge from dredging
3 River fragmentation
 3.1 Artificial barriers upstream from the site
 3.2 Artificial barriers downstream from the site
 3.3 Colinear connected reservoir
4 Morphological alterations
 4.1 Impoundment
 4.2 Channelisation / cross section alteration
 4.3 Alteration of riparian vegetation
 4.4 Alteration of instream habitat
 4.5 Embankments, levees or dikes
 4.6 Sedimentation and sediment input
 4.7 Sand and gravel extraction
 4.8 Loss of vertical connectivity
5 Other hydromorphological pressures
 5.1 Other pressures


  • Measures:
-> Select from list: (see Measures)
1 Water flow quantity improvement
 01.1 Reduce surface water abstraction without return
 01.2 Reduce surface water abstraction with return
 01.3 Improve water retention
 01.4 Reduce groundwater extraction
 01.5 Improve/Create water storage
 01.6 Increase minimum flows
 01.7 Water diversion and transfer
 01.8 Recycle used water
 01.9 Reduce water consumption
2 Sediment flow quantity improvement
 02.1 Add/feed sediment
 02.2 Reduce undesired sediment input
 02.3 Prevent sediment accumulation in reservoirs
 02.4 Reduce erosion
 02.5 Improve continuity of sediment transport
 02.6 Manage dams for sediment flow
 02.7 Trap sediments
3 Flow dynamics improvement
 03.1 Ensure minimum flows
 03.2 Establish environmental flows / naturalise flow regimes
 03.3 Modify hydropeaking
 03.4 Increase flood frequency and duration in riparian zones or floodplains
 03.5 Reduce anthropogenic flow peaks
 03.6 Favour morphogenic flows
 03.7 Shorten the length of impounded reaches
 03.8 Link flood reduction with ecological restoration
 03.9 Manage aquatic vegetation
4 Longitudinal connectivity improvement
 04.1 Remove barrier
 04.2 Install fish pass/bypass/side channel for upstream migration
 04.3 Facilitate downstream migration
 04.4 Modify culverts, syphons, piped streams
 04.5 Manage sluice and weir operation for fish migration
 04.6 Fish-friendly turbines and pumping stations
5 River bed depth and width variation improvement
 05.1 Remeander water courses
 05.2 Widen water courses
 05.3 Shallow water courses
 05.4 Allow/increase lateral channel migration or river mobility
 05.5 Narrow water courses
 05.6 Create low flow channels in over-sized channels
6 In-channel structure and substrate improvement
 06.1 Initiate natural channel dynamics to promote natural regeneration
 06.2 Remove sediments
 06.3 Modify aquatic vegetation maintenance
 06.4 Introduce large wood
 06.5 Add sediments
 06.6 Remove bank fixation
 06.7 Recreate gravel bar and riffles
 06.8 Remove or modify in-channel hydraulic structures
 06.9 Reduce impact of dredging
7 Riparian zone improvement
 07.1 Adjust land use to develop riparian vegetation
 07.2 Revegetate riparian zones
 07.3 Remove bank fixation
 07.4 Remove non-native substratum
 07.5 Adjust land use to reduce nutrient, sediment input or shore erosion
 07.6 Develop riparian forest
8 Floodplains/off-channel/lateral connectivity habitats improvement
 08.1 Lower river banks or floodplains to enlarge inundation and flooding
 08.2 Set back embankments, levees or dikes
 08.3 Reconnect backwaters and wetlands
 08.4 Remove hard engineering structures that impede lateral connectivity
 08.5 Restore wetlands
 08.6 Retain floodwater
 08.7 Improve backwaters
 08.8 Construct semi-natural/articificial wetlands or aquatic habitats
 08.9 Isolation of water bodies
9 Other aims to improve hydrological or morphological conditions
 09.1 Other measures
  • Project size:
-> Length or area of the works and/or rehabilitation activities
  • Approximate costs:
-> Select from list:
1 < 10 000 Euros
2 > 10 000 - < 100 000 Euros
3 > 100 000 - < 1 000 000 Euros
4 > 1 000 000 Euros
  • Synergy:
-> Indicate interaction with other objectives: e.g. flood protection, recreation, etc.
  • Status:
-> Select from list:	 
1 Planned 
2 In progress
3 Realised
  • Period of realization:
-> Period in years during which the project was implemented
  • Evaluation:
-> Select from list:
1 Hydromorphological 
2 Ecological changes
3 Hydromorphological and ecological changes
4 None
  • Implemented by:
-> Institution responsible for the implementation