Difference between revisions of "DOÑANA/RESTAURACIÓN DEL ARROYO DEL PARTIDO"

From REFORM wiki
Jump to: navigation, search
(Extra background information)
(Extra background information)
Line 28: Line 28:
 
Arroyo del Partido has been channelized its final reach for flood prevention. Removing the wall of the left margin, the expansion will allow the water to recover the original floodplain and restore the alluvial fan at its confluence with the marsh.  
 
Arroyo del Partido has been channelized its final reach for flood prevention. Removing the wall of the left margin, the expansion will allow the water to recover the original floodplain and restore the alluvial fan at its confluence with the marsh.  
 
The wall of the right margin is maintained and reinforced to protect the strawberry fields and other irrigation farmland.  
 
The wall of the right margin is maintained and reinforced to protect the strawberry fields and other irrigation farmland.  
This action includes forestry and agri-environment measures, including restoration of the stream margins and actions in the alluvial fan to restore the natural appearance.
+
This action includes forestry and agri-environment measures, including restoration of the stream margins and actions in the alluvial fan to restore the natural appearance.<br /><br />
[[Image:alluvial fan previous.jpg]]
+
[[Image:alluvial fan previous.jpg]]<br /> Aerial view of the alluvial fan previous to the restoration implementation
 +
<br /><br />
 +
[[Image:Plano Partido.jpg]]<br /> Map of the main measures
  
 
==References==
 
==References==

Revision as of 13:46, 6 April 2010

DOÑANA/RESTAURACIÓN DEL ARROYO DEL PARTIDO


Factsheet: Doñana. Restauración del arroyo del Partido

General
Country ES
River Name Arroyo del Partido
Site Name Doñana. Restauración del arroyo del Partido
River Characterisation
    River typology
    Location (Lat Lon) 37.1311714078244, -6.46699905395508
    Altitude lowland: < 200 m
    Catchment area medium: > 100 - 1000 km2
    Geology
    National code/
    River type name
    2

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size -1
    Approximate costs 10 000 - 100 000 Euros
    Synergy Doñana 2005 Hydric regeneration of Doñana´s watersheds and river networks
    Status Realised
    Period of realization 1998 - 2005
    Evaluation None
    Implemented by Ministerio de Medio Ambiente


    Key features of the case study

    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    Arroyo del Partido has been channelized its final reach for flood prevention. Removing the wall of the left margin, the expansion will allow the water to recover the original floodplain and restore the alluvial fan at its confluence with the marsh. The wall of the right margin is maintained and reinforced to protect the strawberry fields and other irrigation farmland. This action includes forestry and agri-environment measures, including restoration of the stream margins and actions in the alluvial fan to restore the natural appearance.

    Alluvial fan previous.jpg
    Aerial view of the alluvial fan previous to the restoration implementation

    Plano Partido.jpg
    Map of the main measures

    References


    Related Measures

    Related Pressures