To improve the hydraulic capacity of the river, as a way to prevent floodings, the woody debris have been removed from the channel, what can be considered an innapropiate measure, but understood if we consider the social context and the point of view of the farmers who cultivate at the floodplain. Also, 4.900 m<sup>3</sup> of sediments  were removed from the river channel.<br />
 
To improve the hydraulic capacity of the river, as a way to prevent floodings, the woody debris have been removed from the channel, what can be considered an innapropiate measure, but understood if we consider the social context and the point of view of the farmers who cultivate at the floodplain. Also, 4.900 m<sup>3</sup> of sediments  were removed from the river channel.<br />
 
The engineering measures considered for flood protection include transversal hydrological correction works, with the construction of five weirs (0,6 m height) and longitudinal spots over 550 m.<br />
 
The engineering measures considered for flood protection include transversal hydrological correction works, with the construction of five weirs (0,6 m height) and longitudinal spots over 550 m.<br />
 +
[[Image:olivenza1.jpg|left|thumb|300px|The Olivenza riparian corridor is fragmentated at some reaches. The plantation of native species is one of the measures aimed to improve the composition and structure of the vegetation ]] <br />
 +
[[Image:olivenza2.jpg|center|thumb|300px|Olivenza riparian corridor]] <br />
  
 
==Success criteria==
 
==Success criteria==

Revision as of 16:50, 9 April 2010

Olivenza. Hydrological and Forestry Restoration of the Olivenza riverside.


Factsheet: Olivenza. Hydrological and Forestry Restoration of the Olivenza riverside.

General
Country ES
River Name Olivenza
Site Name Olivenza. Hydrological and Forestry Restoration of the Olivenza riverside.
River Characterisation
    River typology
    Location (Lat Lon) 38.7696103193883, -7.13244438171387
    Altitude mid-altitude: 200 - 800 m
    Catchment area medium: > 100 - 1000 km2
    Geology Siliceous
    National code/
    River type name
    1 Ríos de llanuras silíceas del Tajo y del Guadiana.

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size -1
    Approximate costs > 1 000 000 Euros
    Synergy proximity of SCI ES4310027
    Status Realised
    Period of realization 2006-2007
    Evaluation
    Implemented by Confederación Hidrográfica del Guadiana. Ministry of Environment


    Key features of the case study

    Site description

    Measures selection

    This should not figure here as a an ecological and hidromorphological restoration project. In fact, the project was design for flood protection, pursued by the construction of levees and weirs.
    Some of the measures can improve the structure and composition of the riparian vegetation: silvicultural treatments (clearing, pruning), elimination of invasive species and plantation of native species.
    To improve the hydraulic capacity of the river, as a way to prevent floodings, the woody debris have been removed from the channel, what can be considered an innapropiate measure, but understood if we consider the social context and the point of view of the farmers who cultivate at the floodplain. Also, 4.900 m3 of sediments were removed from the river channel.
    The engineering measures considered for flood protection include transversal hydrological correction works, with the construction of five weirs (0,6 m height) and longitudinal spots over 550 m.

    The Olivenza riparian corridor is fragmentated at some reaches. The plantation of native species is one of the measures aimed to improve the composition and structure of the vegetation

    Olivenza riparian corridor

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

    Related Pressures