Difference between revisions of "Middle Warta River Valley"

From REFORM wiki
Jump to: navigation, search
(Created page with "=Middle Warta River Valley= <googlemap version="0.9" lat="52.193486" lon="17.898039" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">...")
 
(Key features of the case study)
Line 8: Line 8:
  
 
==Key features of the case study==
 
==Key features of the case study==
 +
 +
This restoration project was implemented as compensation to loss of ecologically important part of Middle Warta River Valley (Natura2000 site) due to construction of the A2 motorway. Compensation activities aimed for restoration of habitats partly devastated by the earlier hydrotechnical works in the valley of the Warta and in turn to create condition for restoring old ornithological values in this area.
  
 
==Site description==
 
==Site description==

Revision as of 12:17, 27 May 2014

Middle Warta River Valley


Factsheet: Warta Middle River Valley

General
Country PL
River Name Warta
Site Name Warta Middle River Valley
River Characterisation
    River typology
    Location (Lat Lon) 52.19303, 17.89746
    Altitude lowland: < 200 m
    Catchment area very large: > 10000 km2
    Geology Calcareous
    National code/
    River type name
    21 Large lowland river

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size 420 ha
    Approximate costs 100 000 - 1 000 000 Euros
    Synergy recreation, agriculture, increase biodiversity, water management
    Status Realised
    Period of realization 2008
    Evaluation Hydromorphological and ecological changes
    Implemented by General Directorate of National Roads and Motorways


    Key features of the case study

    This restoration project was implemented as compensation to loss of ecologically important part of Middle Warta River Valley (Natura2000 site) due to construction of the A2 motorway. Compensation activities aimed for restoration of habitats partly devastated by the earlier hydrotechnical works in the valley of the Warta and in turn to create condition for restoring old ornithological values in this area.

    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

    Related Pressures