Difference between revisions of "Middle Warta River Valley"
From REFORM wiki
(Created page with "=Middle Warta River Valley= <googlemap version="0.9" lat="52.193486" lon="17.898039" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">...") |
(→Key features of the case study) |
||
Line 8: | Line 8: | ||
==Key features of the case study== | ==Key features of the case study== | ||
+ | |||
+ | This restoration project was implemented as compensation to loss of ecologically important part of Middle Warta River Valley (Natura2000 site) due to construction of the A2 motorway. Compensation activities aimed for restoration of habitats partly devastated by the earlier hydrotechnical works in the valley of the Warta and in turn to create condition for restoring old ornithological values in this area. | ||
==Site description== | ==Site description== |
Revision as of 12:17, 27 May 2014
Middle Warta River Valley
Key features of the case study
This restoration project was implemented as compensation to loss of ecologically important part of Middle Warta River Valley (Natura2000 site) due to construction of the A2 motorway. Compensation activities aimed for restoration of habitats partly devastated by the earlier hydrotechnical works in the valley of the Warta and in turn to create condition for restoring old ornithological values in this area.
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Improve/Create water storage
- Improve water retention
- Increase flood frequency and duration in riparian zones or floodplains
- Link flood reduction with ecological restoration
- Manage aquatic vegetation
- Modify culverts, syphons, piped streams
- Reconnect backwaters and wetlands
- Restore wetlands
- Retain floodwater