Difference between revisions of "Improve continuity of sediment transport"
From REFORM wiki
(→Improve continuity of sediment transport) |
|||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
=Improve continuity of sediment transport= | =Improve continuity of sediment transport= | ||
+ | Category 02. Sediment flow quantity improvement | ||
− | |||
==General description == | ==General description == | ||
+ | This measure is described as an alternative for the very similar measure to manage dams for sediment flow in the respective fact sheet [http://wiki.reformrivers.eu/index.php/Manage_dams_for_sediment_flow Manage dams for sediment flow]. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==Pressures that can be addressed by this measure == | ==Pressures that can be addressed by this measure == | ||
<Forecasterlink type="getPressuresForMeasures" code="M14" /> | <Forecasterlink type="getPressuresForMeasures" code="M14" /> | ||
− | |||
==Case studies where this measure has been applied == | ==Case studies where this measure has been applied == | ||
<Forecasterlink type="getProjectsForMeasures" code="M14" /> | <Forecasterlink type="getProjectsForMeasures" code="M14" /> | ||
− | + | ||
− | + | ||
[[Category:Measures]][[Category:02. Sediment flow quantity improvement]] | [[Category:Measures]][[Category:02. Sediment flow quantity improvement]] |
Latest revision as of 08:55, 25 June 2015
Contents
Improve continuity of sediment transport
Category 02. Sediment flow quantity improvement
General description
This measure is described as an alternative for the very similar measure to manage dams for sediment flow in the respective fact sheet Manage dams for sediment flow.
Pressures that can be addressed by this measure
- Reservoir flushing
- Sediment discharge from dredging
- Colinear connected reservoir
- Sand and gravel extraction
- Artificial barriers upstream from the site
- Artificial barriers downstream from the site
- Impoundment
- Sedimentation and sediment input