Difference between revisions of "Remove non-native substratum"
From REFORM wiki
(New page: =Remove non-native substratum= Remove non-native substratumRiparian zone improvement ==General description == ==Applicability == ==Expected effect of measure on (including literature ci...) |
|||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | + | '''No literature found. If you have information, please contact us.''' | |
− | + | ||
− | + | ||
− | + | ||
==General description == | ==General description == | ||
− | |||
==Applicability == | ==Applicability == | ||
==Expected effect of measure on (including literature citations): == | ==Expected effect of measure on (including literature citations): == | ||
− | |||
− | |||
− | |||
==Temporal and spatial response == | ==Temporal and spatial response == | ||
==Pressures that can be addressed by this measure == | ==Pressures that can be addressed by this measure == | ||
Line 19: | Line 12: | ||
==Other relevant information == | ==Other relevant information == | ||
− | [[Category:Measures]][[Category:Riparian zone improvement]] | + | [[Category:Measures]][[Category:07. Riparian zone improvement]] |
Latest revision as of 20:32, 8 December 2015
No literature found. If you have information, please contact us.
Contents
- 1 General description
- 2 Applicability
- 3 Expected effect of measure on (including literature citations):
- 4 Temporal and spatial response
- 5 Pressures that can be addressed by this measure
- 6 Cost-efficiency
- 7 Case studies where this measure has been applied
- 8 Useful references
- 9 Other relevant information
General description
Applicability
Expected effect of measure on (including literature citations):
Temporal and spatial response
Pressures that can be addressed by this measure
Cost-efficiency
Case studies where this measure has been applied
- Anzur. Intervención de mejora ambiental de un tramo del Río Anzur
- Oberwerries - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)
- Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)