Difference between revisions of "Haselünne"

From REFORM wiki
Jump to: navigation, search
(Key features of the case study)
(References)
Line 36: Line 36:
 
<references/>
 
<references/>
  
==References==
 
<references/>
 
  
[[Category:Case_studies]]
 
  
 
== Related Measures ==
 
== Related Measures ==

Revision as of 11:35, 19 April 2010

Haselünne


Factsheet: Haselünne

General
Country DE
River Name Hase
Site Name Haselünne
River Characterisation
    River typology
    Location (Lat Lon) 52.6837191809208, 7.40169525146484
    Altitude lowland: < 200 m
    Catchment area large: > 1000 - 10000 km2
    Geology Siliceous
    National code/
    River type name
    Type 15

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size 7 km
    Approximate costs > 1 000 000 Euros
    Synergy Flood protection
    Status Realised
    Period of realization 1997-2001
    Evaluation Hydromorphological changes
    Implemented by Landkreis Emsland (district Emsland), NGO Haseauenverein (www.haseauenverein.de)


    Key features of the case study

    Project area, city of Haselünne in western part, map from http://www.haseauenverein.de/eunde.html

    The main objective of the project was to re-connect the channel and the adjacent floodplain area and to re-connect side-channels. The total amount of money available for the project was 10.2 million Euro.


    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    A monitoring of the hydromorphological changes has been carried out by the University of Osnabrück, Department of Biology and Chemistry.

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References



    Related Measures

    Related Pressures