Difference between revisions of "Template factsheet"

From REFORM wiki
Jump to: navigation, search
(New page: ==Site name:== ==Country== -> Select from list of countries of the world ==River Name== ==Site== ==Site Name== ==River typology== * Location: Latitude and Longitude * Altit...)
 
Line 1: Line 1:
==Site name:==
+
* Site name:
 
    
 
    
==Country==
+
* Country:
-> Select from list of countries of the world 
+
  
==River Name==
+
* River Name:
 
   
 
   
==Site==
+
* Site Name:
  
==Site Name==  
+
* River typology: from WFD classification for European water bodies
 +
** Location (Latitude and Longitude, or click on the Google map)
 +
** Altitude 
 +
** Catchment area
 +
** Geology  
  
==River typology==
+
* National code and River type name:
  
* Location:  Latitude and Longitude
+
* Hydromorphological quality elements:
* Altitude:  select from WFD classification
+
* Catchment area: medium: > 100 - 1000 km2
+
* Geology Calcareous
+
 
+
==National code and River type name
+
 
+
==Hydromorphological quality elements
+
 
  -> select from list of WFD:  
 
  -> select from list of WFD:  
  # Hydrological regime
+
  1 Hydrological regime
  ## Quantity and dynamics of water flow
+
  1.1 Quantity and dynamics of water flow
  ## Connection to groundwater bodies
+
  1.2 Connection to groundwater bodies
  # River continuity
+
  2 River continuity
  ## River continuity
+
  2.1 River continuity
  # Morphological conditions
+
  3 Morphological conditions
  ## River depth and width variation
+
  3.1 River depth and width variation
  ## Structure and substrate of the river bed
+
  3.2 Structure and substrate of the river bed
  ## Structure of the riparian zone
+
  3.3 Structure of the riparian zone
  ## Structure of the floodplain
+
  3.4 Structure of the floodplain
  
==Biological quality elements==
+
* Biological quality elements:
 
  -> Select from list of WFD:
 
  -> Select from list of WFD:
  # Phytoplankton
+
  1 Phytoplankton
  # Macrophytes and phytobenthos
+
  2 Macrophytes and phytobenthos
  # Benthic invertebrates
+
  3 Benthic invertebrates
  # Fish
+
  4 Fish
  
==Pressures==
+
* Pressures:
 
  -> Select from list:  
 
  -> Select from list:  
01. Water abstractions
+
1 Water abstractions
 
   1.1 Surface water abstraction
 
   1.1 Surface water abstraction
 
   1.2 Groundwater abstractions
 
   1.2 Groundwater abstractions
02. Flow regulations
+
2 Flow regulations
 
   2.1 Discharge diversions and returns
 
   2.1 Discharge diversions and returns
 
   2.2 Interbasin flow transfers
 
   2.2 Interbasin flow transfers
Line 51: Line 47:
 
   2.5 Reservoir flushing
 
   2.5 Reservoir flushing
 
   2.6 Sediment discharge from dredging
 
   2.6 Sediment discharge from dredging
03. River fragmentation
+
3 River fragmentation
 
   3.1 Artificial barriers upstream from the site
 
   3.1 Artificial barriers upstream from the site
 
   3.2 Artificial barriers downstream from the site
 
   3.2 Artificial barriers downstream from the site
 
   3.3 Colinear connected reservoir
 
   3.3 Colinear connected reservoir
04. Morphological alterations
+
4 Morphological alterations
 
   4.1 Impoundment
 
   4.1 Impoundment
 
   4.2 Channelisation / cross section alteration
 
   4.2 Channelisation / cross section alteration
Line 64: Line 60:
 
   4.7 Sand and gravel extraction
 
   4.7 Sand and gravel extraction
 
   4.8 Loss of vertical connectivity
 
   4.8 Loss of vertical connectivity
05. Other hydromorphological pressures
+
5 Other hydromorphological pressures
 
   5.1 Other pressures
 
   5.1 Other pressures
  
  
 
+
* Measures:
Measures -- select from  
+
-> Select from list:
01. Water flow quantity improvement
+
1 Water flow quantity improvement
 
   01.1 Reduce surface water abstraction without return
 
   01.1 Reduce surface water abstraction without return
 
   01.2 Reduce surface water abstraction with return
 
   01.2 Reduce surface water abstraction with return
Line 80: Line 76:
 
   01.8 Recycle used water
 
   01.8 Recycle used water
 
   01.9 Reduce water consumption
 
   01.9 Reduce water consumption
02. Sediment flow quantity improvement
+
2 Sediment flow quantity improvement
 
   02.1 Add/feed sediment
 
   02.1 Add/feed sediment
 
   02.2 Reduce undesired sediment input
 
   02.2 Reduce undesired sediment input
Line 88: Line 84:
 
   02.6 Manage dams for sediment flow
 
   02.6 Manage dams for sediment flow
 
   02.7 Trap sediments
 
   02.7 Trap sediments
03. Flow dynamics improvement
+
3 Flow dynamics improvement
 
   03.1 Ensure minimum flows
 
   03.1 Ensure minimum flows
 
   03.2 Establish environmental flows / naturalise flow regimes
 
   03.2 Establish environmental flows / naturalise flow regimes
Line 98: Line 94:
 
   03.8 Link flood reduction with ecological restoration
 
   03.8 Link flood reduction with ecological restoration
 
   03.9 Manage aquatic vegetation
 
   03.9 Manage aquatic vegetation
04. Longitudinal connectivity improvement
+
4 Longitudinal connectivity improvement
 
   04.1 Remove barrier
 
   04.1 Remove barrier
 
   04.2 Install fish pass/bypass/side channel for upstream migration
 
   04.2 Install fish pass/bypass/side channel for upstream migration
Line 105: Line 101:
 
   04.5 Manage sluice and weir operation for fish migration
 
   04.5 Manage sluice and weir operation for fish migration
 
   04.6 Fish-friendly turbines and pumping stations
 
   04.6 Fish-friendly turbines and pumping stations
05. River bed depth and width variation improvement
+
5 River bed depth and width variation improvement
 
   05.1 Remeander water courses
 
   05.1 Remeander water courses
 
   05.2 Widen water courses
 
   05.2 Widen water courses
Line 112: Line 108:
 
   05.5 Narrow water courses
 
   05.5 Narrow water courses
 
   05.6 Create low flow channels in over-sized channels
 
   05.6 Create low flow channels in over-sized channels
06. In-channel structure and substrate improvement
+
6 In-channel structure and substrate improvement
 
   06.1 Initiate natural channel dynamics to promote natural regeneration
 
   06.1 Initiate natural channel dynamics to promote natural regeneration
 
   06.2 Remove sediments
 
   06.2 Remove sediments
Line 122: Line 118:
 
   06.8 Remove or modify in-channel hydraulic structures
 
   06.8 Remove or modify in-channel hydraulic structures
 
   06.9 Reduce impact of dredging
 
   06.9 Reduce impact of dredging
07. Riparian zone improvement
+
7 Riparian zone improvement
 
   07.1 Adjust land use to develop riparian vegetation
 
   07.1 Adjust land use to develop riparian vegetation
 
   07.2 Revegetate riparian zones
 
   07.2 Revegetate riparian zones
Line 129: Line 125:
 
   07.5 Adjust land use to reduce nutrient, sediment input or shore erosion
 
   07.5 Adjust land use to reduce nutrient, sediment input or shore erosion
 
   07.6 Develop riparian forest
 
   07.6 Develop riparian forest
08. Floodplains/off-channel/lateral connectivity habitats improvement
+
8 Floodplains/off-channel/lateral connectivity habitats improvement
 
   08.1 Lower river banks or floodplains to enlarge inundation and flooding
 
   08.1 Lower river banks or floodplains to enlarge inundation and flooding
 
   08.2 Set back embankments, levees or dikes
 
   08.2 Set back embankments, levees or dikes
Line 139: Line 135:
 
   08.8 Construct semi-natural/articificial wetlands or aquatic habitats
 
   08.8 Construct semi-natural/articificial wetlands or aquatic habitats
 
   08.9 Isolation of water bodies
 
   08.9 Isolation of water bodies
09. Other aims to improve hydrological or morphological conditions
+
9 Other aims to improve hydrological or morphological conditions
 
   09.1 Other measures
 
   09.1 Other measures
  
 +
* Project size (length or area):
  
 +
* Approximate costs (Euros):
 +
-> Select from list:
 +
** < 10 000 Euros
 +
** > 10 000 - < 100 000
 +
** > 100 000 - < 1 000 000
 +
** > 1 000 000
  
Project size -1
+
* Synergy:
  
Approximate costs select from
+
* Status:
< 10 000 Euros
+
-> Select from list:
> 10 000 < 100 000
+
** Planned
> 100 000 < 1 000 000
+
** Realised
> 1 000 000
+
  
> 1 000 000 Euros
+
* Period of realization:
  
Synergy SCI of the Chícamo River (SCI ES6200028)
+
* Evaluation:
 
+
  -> Select from list:
Status Realised
+
** Hydromorphological  
 
+
** Ecological changes
Period of realization 1/01/2005-31/12/2008
+
** Hydromorphological and ecological changes
 
+
** None
Evaluation -- select from
+
Hydromorphological
+
Ecological changes
+
Hydromorphological and ecological changes
+
None
+
 
+
 
+
 
+
Implemented by
+
 
+
 
+
 
+
 
+
  -> Particular conditions of the site: size, river type, type of pressures, ecological status, etc.
+
 
+
 
+
==Measures selection==
+
-> Motivation/argumentation behind the selection of the measures implemented.
+
 
+
 
+
==Success criteria==
+
-> Brief description of the parameters used to assess the success of the project.
+
 
+
 
+
==Ecological response==
+
-> Brief description of observed effects of the measures over different types of organisms.
+
* Phytoplankton
+
 
+
* Macrophytes and phytobenthos
+
 
+
* Benthic Invertebrates
+
 
+
* Fish
+
 
+
* Other biota
+
 
+
 
+
==Hydromorphological response==
+
-> Brief description of observed effects of the measures over different hydromorphological elements.
+
* Hydrological regime
+
* River continuity
+
* Morphological conditions
+
 
+
 
+
==Monitoring before and after implementation of the project==
+
-> Brief description of available records and data ownership.
+
 
+
 
+
==Socio-economic aspects==
+
-> Brief description of socio-economic conditions in the site of the project and how the implementation of the project affects other ecosystem goods and services (e.g. recreation, water purification, flood protection, forestry, etc)
+
 
+
* Ecosystem goods and services:
+
 
+
* Conflicts and synergies:
+
 
+
* Project costs:
+
 
+
 
+
==Contact person within the organization==
+
-> Full name and email address of a person within the organisation that implemented the project who can provide more detailed information. 
+
 
+
 
+
==Extra background information==
+
-> Any other information about the project can be listed here.  Links can be made to other websites where the project is mentioned.  Support documents can be uploaded (e.g. photos, pdf files).
+
 
+
  
==References==
+
Implemented by:
  -> Please acknowledge all sources of information used to write this wiki page.
+
  -> Institution responsible for the implementation
<references/>
+

Revision as of 16:31, 15 June 2010

  • Site name:
  • Country:
  • River Name:
  • Site Name:
  • River typology: from WFD classification for European water bodies
    • Location (Latitude and Longitude, or click on the Google map)
    • Altitude
    • Catchment area
    • Geology
  • National code and River type name:
  • Hydromorphological quality elements:
-> select from list of WFD: 
1 Hydrological regime
1.1 Quantity and dynamics of water flow
1.2 Connection to groundwater bodies
2 River continuity
2.1 River continuity
3 Morphological conditions
3.1 River depth and width variation
3.2 Structure and substrate of the river bed
3.3 Structure of the riparian zone
3.4 Structure of the floodplain
  • Biological quality elements:
-> Select from list of WFD:
1 Phytoplankton
2 Macrophytes and phytobenthos
3 Benthic invertebrates
4 Fish
  • Pressures:
-> Select from list: 

1 Water abstractions

 1.1 Surface water abstraction
 1.2 Groundwater abstractions

2 Flow regulations

 2.1 Discharge diversions and returns
 2.2 Interbasin flow transfers
 2.3 Hydrological regime modification
 2.4 Hydropeaking
 2.5 Reservoir flushing
 2.6 Sediment discharge from dredging

3 River fragmentation

 3.1 Artificial barriers upstream from the site
 3.2 Artificial barriers downstream from the site
 3.3 Colinear connected reservoir

4 Morphological alterations

 4.1 Impoundment
 4.2 Channelisation / cross section alteration
 4.3 Alteration of riparian vegetation
 4.4 Alteration of instream habitat
 4.5 Embankments, levees or dikes
 4.6 Sedimentation and sediment input
 4.7 Sand and gravel extraction
 4.8 Loss of vertical connectivity

5 Other hydromorphological pressures

 5.1 Other pressures


  • Measures:
-> Select from list:

1 Water flow quantity improvement

 01.1 Reduce surface water abstraction without return
 01.2 Reduce surface water abstraction with return
 01.3 Improve water retention
 01.4 Reduce groundwater extraction
 01.5 Improve/Create water storage
 01.6 Increase minimum flows
 01.7 Water diversion and transfer
 01.8 Recycle used water
 01.9 Reduce water consumption

2 Sediment flow quantity improvement

 02.1 Add/feed sediment
 02.2 Reduce undesired sediment input
 02.3 Prevent sediment accumulation in reservoirs
 02.4 Reduce erosion
 02.5 Improve continuity of sediment transport
 02.6 Manage dams for sediment flow
 02.7 Trap sediments

3 Flow dynamics improvement

 03.1 Ensure minimum flows
 03.2 Establish environmental flows / naturalise flow regimes
 03.3 Modify hydropeaking
 03.4 Increase flood frequency and duration in riparian zones or floodplains
 03.5 Reduce anthropogenic flow peaks
 03.6 Favour morphogenic flows
 03.7 Shorten the length of impounded reaches
 03.8 Link flood reduction with ecological restoration
 03.9 Manage aquatic vegetation

4 Longitudinal connectivity improvement

 04.1 Remove barrier
 04.2 Install fish pass/bypass/side channel for upstream migration
 04.3 Facilitate downstream migration
 04.4 Modify culverts, syphons, piped streams
 04.5 Manage sluice and weir operation for fish migration
 04.6 Fish-friendly turbines and pumping stations

5 River bed depth and width variation improvement

 05.1 Remeander water courses
 05.2 Widen water courses
 05.3 Shallow water courses
 05.4 Allow/increase lateral channel migration or river mobility
 05.5 Narrow water courses
 05.6 Create low flow channels in over-sized channels

6 In-channel structure and substrate improvement

 06.1 Initiate natural channel dynamics to promote natural regeneration
 06.2 Remove sediments
 06.3 Modify aquatic vegetation maintenance
 06.4 Introduce large wood
 06.5 Add sediments
 06.6 Remove bank fixation
 06.7 Recreate gravel bar and riffles
 06.8 Remove or modify in-channel hydraulic structures
 06.9 Reduce impact of dredging

7 Riparian zone improvement

 07.1 Adjust land use to develop riparian vegetation
 07.2 Revegetate riparian zones
 07.3 Remove bank fixation
 07.4 Remove non-native substratum
 07.5 Adjust land use to reduce nutrient, sediment input or shore erosion
 07.6 Develop riparian forest

8 Floodplains/off-channel/lateral connectivity habitats improvement

 08.1 Lower river banks or floodplains to enlarge inundation and flooding
 08.2 Set back embankments, levees or dikes
 08.3 Reconnect backwaters and wetlands
 08.4 Remove hard engineering structures that impede lateral connectivity
 08.5 Restore wetlands
 08.6 Retain floodwater
 08.7 Improve backwaters
 08.8 Construct semi-natural/articificial wetlands or aquatic habitats
 08.9 Isolation of water bodies

9 Other aims to improve hydrological or morphological conditions

 09.1 Other measures
  • Project size (length or area):
  • Approximate costs (Euros):
-> Select from list:
    • < 10 000 Euros
    • > 10 000 - < 100 000
    • > 100 000 - < 1 000 000
    • > 1 000 000
  • Synergy:
  • Status:
-> Select from list:	 
    • Planned
    • Realised
  • Period of realization:
  • Evaluation:
-> Select from list:
    • Hydromorphological
    • Ecological changes
    • Hydromorphological and ecological changes
    • None

Implemented by:

-> Institution responsible for the implementation