Difference between revisions of "Isar Muenchen"

From REFORM wiki
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 +
=Isar Muenchen=
  
 +
<googlemap version="0.9" lat="48.1243928123102" lon="11.5711784362793" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">
 +
(A) 48.1243928123102, 11.5711784362793</googlemap>
 +
 +
<Forecasterlink type="getProjectInfoBox" code="24" />
 +
 
 +
==Key features of the case study==
 +
 
 +
 +
==Site description==
 +
 +
==Measures selection==
 +
 +
==Success criteria==
 +
 +
==Ecological response==
 +
 +
==Hydromorphological response==
 +
 +
==Monitoring before and after implementation of the project==
 +
 +
==Socio-economic aspects==
 +
 +
==Contact person within the organization==
 +
 +
==Extra background information==
 +
 +
 +
==References==
 +
<references/>
 +
 +
[[Category:Case_studies]]
 +
 +
== Related Measures ==
 +
 +
<Forecasterlink type="getMeasuresForProject" code="24" />
 +
 +
== Related Pressures ==
 +
 +
<Forecasterlink type="getPressuresForProject" code="24" />

Latest revision as of 14:27, 28 July 2011

Isar Muenchen


Factsheet:

General
Country
River Name
Site Name
River Characterisation
    River typology
    Location (Lat Lon) ,
    Altitude
    Catchment area
    Geology
    National code/
    River type name

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size
    Approximate costs
    Synergy
    Status
    Period of realization
    Evaluation


    Key features of the case study

    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

      No measures have been assigned to this project.

    Related Pressures