Difference between revisions of "Doñana Restauración de la marisma Gallega"
From REFORM wiki
m (→Extra background information) |
m (→Measures selection) |
||
Line 12: | Line 12: | ||
==Measures selection== | ==Measures selection== | ||
− | + | :*Eliminate the artificial drainage network<br /> | |
− | + | :*Recover the hydrological regime of the marsh<br /> | |
+ | :*Restore the original morphology of the braided channels <br /> | ||
+ | :*Re-establish the communication with the Doñana marsh | ||
+ | |||
==Success criteria== | ==Success criteria== | ||
Latest revision as of 18:24, 9 April 2010
Doñana Restauración de la marisma Gallega
Key features of the case study
Site description
Measures selection
- Eliminate the artificial drainage network
- Recover the hydrological regime of the marsh
- Restore the original morphology of the braided channels
- Re-establish the communication with the Doñana marsh
- Eliminate the artificial drainage network
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
The agricultural Plan Almonte-Marismas impulsed by the FAO in the 1960´s created a network of artificial drainage channels through the marsh,to transform it into irrigated crops, although this sector of the marshes was never cultivated.
The natural flow is spread through the drainage network, reducing the natural contribution to the marshes.Also,a wall constructed by the FAO, isolates this space from the doñana marshes. The morphology of the braided channels has suffered also modifications.
References
Related Measures
- No measures have been assigned to this project.