Difference between revisions of "Manage dams for sediment flow"
From REFORM wiki
(New page: =Manage dams for sediment flow= Manage dams for sediment flowSediment flow quantity improvement ==General description == ==Applicability == ==Expected effect of measure on (including li...) |
|||
Line 1: | Line 1: | ||
− | |||
=Manage dams for sediment flow= | =Manage dams for sediment flow= | ||
− | Manage dams for sediment | + | Manage dams for sediment flow02. Sediment flow quantity improvement |
==General description == | ==General description == | ||
Line 19: | Line 18: | ||
==Other relevant information == | ==Other relevant information == | ||
− | [[Category:Measures]][[Category:Sediment flow quantity improvement]] | + | [[Category:Measures]][[Category:02. Sediment flow quantity improvement]] |
Revision as of 13:08, 18 March 2010
Contents
- 1 Manage dams for sediment flow
- 1.1 General description
- 1.2 Applicability
- 1.3 Expected effect of measure on (including literature citations):
- 1.4 Temporal and spatial response
- 1.5 Pressures that can be addressed by this measure
- 1.6 Cost-efficiency
- 1.7 Case studies where this measure has been applied
- 1.8 Useful references
- 1.9 Other relevant information
Manage dams for sediment flow
Manage dams for sediment flow02. Sediment flow quantity improvement
General description
Applicability
Expected effect of measure on (including literature citations):
- HYMO (general and specified per HYMO element)
- physico � chemical parameters
- Biota (general and specified per Biological quality elements)
Temporal and spatial response
Pressures that can be addressed by this measure
- Reservoir flushing
- Artificial barriers upstream from the site
- Artificial barriers downstream from the site
- Impoundment
- Sedimentation and sediment input