Difference between revisions of "Ems floodplain (LIFE project)"
From REFORM wiki
(→Key features of the case study) |
(→Key features of the case study) |
||
Line 7: | Line 7: | ||
==Key features of the case study== | ==Key features of the case study== | ||
− | The Ems is a large sand-bed river and its floodplains were deforested and used for agriculture purpose. The district Emsland has carried out a LIFE project to restore the Ems floodplains: "naturnahe Flussdynamik an der niedersächsischen Ems" (natural river dynamics in the Ems in Lower Saxony). For more information see the website in German: http://www.ems-life.de/ | + | The Ems is a large sand-bed river and its floodplains were deforested and used for agriculture purpose. The district Emsland has carried out a LIFE project to restore the Ems floodplains: "naturnahe Flussdynamik an der niedersächsischen Ems" (natural river dynamics in the Ems in Lower Saxony). For more information see the website in German: http://www.ems-life.de/ <br> |
+ | The main objectives were to remove the bank fixation to allow for natural channel dynamics and to change land-use on the floodplain to allow for natural sucession and the development of a riparian and flooplain forest. | ||
==Site description== | ==Site description== |
Revision as of 09:13, 12 April 2010
Ems floodplain (LIFE project)
Key features of the case study
The Ems is a large sand-bed river and its floodplains were deforested and used for agriculture purpose. The district Emsland has carried out a LIFE project to restore the Ems floodplains: "naturnahe Flussdynamik an der niedersächsischen Ems" (natural river dynamics in the Ems in Lower Saxony). For more information see the website in German: http://www.ems-life.de/
The main objectives were to remove the bank fixation to allow for natural channel dynamics and to change land-use on the floodplain to allow for natural sucession and the development of a riparian and flooplain forest.
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Install fish pass/bypass/side channel for upstream migration
- Remove bank fixation
- Develop riparian forest
- Adjust land use to develop riparian vegetation
- Revegetate riparian zones
- Remove bank fixation