Difference between revisions of "Freshwater Pearl Mussel and its habitats (LIFE04/NAT/SE/00023)"
(→Key features of the case study) |
(→Measures selection) |
||
Line 50: | Line 50: | ||
==Measures selection== | ==Measures selection== | ||
+ | |||
+ | |||
+ | Several measures were implemented aiming to restore the Margaritifera margaritifera population using different means: | ||
+ | |||
+ | - Water flow quantity improvement | ||
+ | Repairing a dam that regulates the water flow into the stream Lillsjöbäcken to avoid water shortage in summer | ||
+ | |||
+ | - Sedimnt flow quantity improvement | ||
+ | Blocking of 17 ditches with wood and ground materials to reduce negative impact from siltation | ||
+ | |||
+ | - Longitudinal connectivity improvement | ||
+ | Removing obstacles | ||
+ | Fixing incorrectly placed road culverts | ||
+ | Building bypasses around migration obstacles | ||
+ | |||
+ | - In-channel structure and substrate improvement | ||
+ | Deposit of gravel and small stones in fast-flowing river sectionsn (restoration of around 1 300 m2 of stream grounds across eight sites through ) | ||
+ | |||
+ | - Riparian zone improvement | ||
+ | Removal of spruce and other vegetation which impact on streams, in favour of deciduous trees along two shoreline sites (a total of 4.5 hectares buffer zone have been thinned and cleared along the streams Sollumsån and Bratteforsån) | ||
+ | |||
+ | - Specie enhancement | ||
+ | Reintroduction of freshwater pearl mussels (1 000 mussels collected from a nearby watercourse in the same basin.) | ||
+ | |||
+ | Constraints | ||
+ | |||
+ | Every measures were not implemented as foreseen due to different constraints. Some actions were actually compromised due to historic cultural values, and one action was postponed due to disagreement with landowner. | ||
+ | Furthermore, the planned deposit of gravel was less than anticipated due to research which revealed lower need. | ||
==Success criteria== | ==Success criteria== |
Revision as of 15:36, 30 June 2011
Freshwater Pearl Mussel and its habitats (LIFE04/NAT/SE/00023)
Key features of the case study
Drivers
Main concerns: Ecological concerns Legal requirements: Natura 2000 Opportunities: Broader management plan (swedish national conservation plan)
95 % of the Fresh Pearl water mussel population in Central Europe has fallen. The specie is classified by IUCN as endangered and is included in the EU habitat directive. Sweden is home to a large part of the remaining population (a core area) and therefore have an international responsibility for the species’ long-term survival’.
Pressures
Hydrological regime modification Artificial barries upstream from the site Artificial barries downstream from the site Alteration of instream habitats Sedimentation and sediment input Nutrients pollution Micropollutants Acidification
Humans activities
Mainly forestry Agriculture
Global objectives
Species enhancement and habitats improvement were the main objectives of the project by developing and testing methods to achieve a favourable conservation status for the freshwater pearl mussel (Margaritifera margaritifera) in Sweden. However, freshwater mussel was not the only target specie of the project. A freshwater mussel population decrease highlights a deterioration of the environnment, the improvement of freshwater mussels habitats will thus benefit other aquatic species such as host fish.
Specific goals (process oriented)
In order to achieve the conservation of Margaritifera margaritifera, the project aimed to : 1. eliminate the migration obstacles to host fish along ten watercourses, 2. improve the river bed in eight watercourses, 3. manage the banks along two small rivers 4. Re-introduce young mussels (test in one stream)
Measurable criteria
The mussel recruitment was expected within the coming 10–20 years. None measurable criteria were actually set in the frame of the LIFE project due its too short time frame. However, measurable criteria with regards to the Margaritifera margaritifera recruitment have been set in the frame of the swedish national conservation plan (XX).
Site description
Measures selection
Several measures were implemented aiming to restore the Margaritifera margaritifera population using different means:
- Water flow quantity improvement Repairing a dam that regulates the water flow into the stream Lillsjöbäcken to avoid water shortage in summer
- Sedimnt flow quantity improvement Blocking of 17 ditches with wood and ground materials to reduce negative impact from siltation
- Longitudinal connectivity improvement Removing obstacles Fixing incorrectly placed road culverts Building bypasses around migration obstacles
- In-channel structure and substrate improvement Deposit of gravel and small stones in fast-flowing river sectionsn (restoration of around 1 300 m2 of stream grounds across eight sites through )
- Riparian zone improvement Removal of spruce and other vegetation which impact on streams, in favour of deciduous trees along two shoreline sites (a total of 4.5 hectares buffer zone have been thinned and cleared along the streams Sollumsån and Bratteforsån)
- Specie enhancement Reintroduction of freshwater pearl mussels (1 000 mussels collected from a nearby watercourse in the same basin.)
Constraints
Every measures were not implemented as foreseen due to different constraints. Some actions were actually compromised due to historic cultural values, and one action was postponed due to disagreement with landowner. Furthermore, the planned deposit of gravel was less than anticipated due to research which revealed lower need.
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Remove barrier
- Narrow water courses
- Improve/Create water storage
- Reduce undesired sediment input
- Install fish pass/bypass/side channel for upstream migration
- Modify culverts, syphons, piped streams
- Develop riparian forest