Difference between revisions of "Doñana Restauración de la marisma Gallega"
From REFORM wiki
(New page: =Doñana Restauración de la marisma Gallega= <googlemap version="0.9" lat="37.1096816514256" lon="-6.37275695800781" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="n...) |
m (→Extra background information) |
||
Line 27: | Line 27: | ||
==Extra background information== | ==Extra background information== | ||
− | The agricultural Plan Almonte-Marismas impulsed by the FAO in the 1960´s created a network of artificial drainage channels through the marsh,to transform it into irrigated crops, although this sector of the marshes was never | + | The agricultural Plan Almonte-Marismas impulsed by the FAO in the 1960´s created a network of artificial drainage channels through the marsh,to transform it into irrigated crops, although this sector of the marshes was never cultivated.<br /> |
− | The natural flow is spread through the drainage network, reducing the natural contribution to the marshes.Also, a wall constructed by the FAO, isolates this space from the doñana marshes. The morphology of the braided channels has suffered also modifications. | + | The natural flow is spread through the drainage network, reducing the natural contribution to the marshes.Also,a wall constructed by the FAO, isolates this space from the doñana marshes. The morphology of the braided channels has suffered also modifications. |
− | + | ||
− | + | ||
==References== | ==References== |
Revision as of 18:22, 9 April 2010
Doñana Restauración de la marisma Gallega
Key features of the case study
Site description
Measures selection
Elimination of artificial drainage and recovery of the hydrological regime of the marsh, restoring the original network of braided channels of the marsh, restablishing the communication with the doñana marshes. sectors of the marsh.
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
The agricultural Plan Almonte-Marismas impulsed by the FAO in the 1960´s created a network of artificial drainage channels through the marsh,to transform it into irrigated crops, although this sector of the marshes was never cultivated.
The natural flow is spread through the drainage network, reducing the natural contribution to the marshes.Also,a wall constructed by the FAO, isolates this space from the doñana marshes. The morphology of the braided channels has suffered also modifications.
References
Related Measures
- No measures have been assigned to this project.