A monitoring programme was elaborated and implemented so as to find answers to all major issues regarding restoration, to document the development subsequent to the re-flooding and to verify the success of the measures taken. This allowed to show development trends, evaluate the measures and, if required, to propose further corrective supplementary measures. First results as for the restoration of hydrological, biogeochemical and ecological functions have been published in 1997 in a comprehensive report elaborated in co-operation with the Danube Delta National Institute for Research and Development in Tulcea, Romania, and WWF Germany’s Institute for Floodplain Ecology, Rastatt (recently integrated as chair in the Institute for Water and River Basin Management, University of Karlsruhe).
  
 
==Socio-economic aspects==
 
==Socio-economic aspects==

Revision as of 06:06, 26 May 2010

Babina


Factsheet: Babina

General
Country RO
River Name Danube
Site Name Babina
River Characterisation
    River typology
    Location (Lat Lon) 45.424763, 29.411763
    Altitude lowland: < 200 m
    Catchment area very large: > 10000 km2
    Geology Siliceous
    National code/
    River type name
    RO15/Large slow flowing river over sand/clay

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size 2100 ha
    Approximate costs 100 000 - 1 000 000 Euros
    Synergy Nutrient removal, wildlife habitat
    Status Realised
    Period of realization 1994
    Evaluation Hydromorphological and ecological changes
    Implemented by Danube Delta National Institute for Research and Development and Danube Delta Biosphere Reserve Authority


    Key features of the case study

    Site description

    During the last decades of the 20th century, the Danube Delta has suffered from human interventions that led to dramatic changes in some areas. These interventions consisted in the dyking of large areas for the purpose of agricultural use, intensive fish-farming and forestry, which resulted in dramatic alterations or disturbances of the water balance. This had effects on the alteration of natural processes, the ecological balance as well as the characteristic functions of wetlands and led to a deterioration, or worse the loss of area-specific habitats. When the transformation measures were stopped in early 1990, the dyked area covered 97.408 ha (22 %) of the total 482.592 ha, including Babina polder(2100 ha), designed to be a rice polder but abandoned before to be fully built. Studies for rehabilitation/restoration measures were started in the Danube Delta immediately following its declaration as Biosphere Reserve in 1990.

    Measures selection

    The objective of ecological reconstruction/restoration was to restore the natural, site-specific hydrological, biogeochemical and ecological functions, to ensure the redevelopment of the ecosystem and its functions and thus to promote the development of site-specific habitats and their biodiversity. Moreover, the redevelopment of the natural resources should enable the local populations to proceed to their sustainable, traditional use. Given that the ecosystems of the Danube Delta depend on the dynamics of the Danube River, the re-establishment of the hydrological regime reveals to be the most important factor to be considered in restoration. In the case of dyked and drained polders that are no longer useful for agricultural purposes, the reconnection to the flood regime of the Danube is the measure to be taken and the prerequisite for a successful restoration. Such measures do not restore the original conditions of the time before the dyking, given that this would require a complete removal of the dams, which again reveals impossible in view of extremely high costs so, the opening of the dams in specific hydrological and ecologically effective spots and the reconnection to the river dynamics could restore a better performance of the ecosystem.

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    A monitoring programme was elaborated and implemented so as to find answers to all major issues regarding restoration, to document the development subsequent to the re-flooding and to verify the success of the measures taken. This allowed to show development trends, evaluate the measures and, if required, to propose further corrective supplementary measures. First results as for the restoration of hydrological, biogeochemical and ecological functions have been published in 1997 in a comprehensive report elaborated in co-operation with the Danube Delta National Institute for Research and Development in Tulcea, Romania, and WWF Germany’s Institute for Floodplain Ecology, Rastatt (recently integrated as chair in the Institute for Water and River Basin Management, University of Karlsruhe).

    Socio-economic aspects

    Contact person within the organization

    Marian Tudor

    mtudor@indd.tim.ro

    Extra background information

    References


    Related Measures

    Related Pressures