Working with physical form and function of river and floodplains River bed raising or lowering Structural modifications Construction of new structures Modify/replace existing structures Changes in system operation Appropriate vegetation management plan
Other
Project size
1 km2
Approximate costs
0
Synergy
Flood control
Status
Realised
Period of realization
1999
Evaluation
Yes
Attention:The information presented below has been reproduced from the ECRR brochure[1] Cite error: <ref> tags exist, but no <references/> tag was found