Biodiversity conservation and recovery in the river basin of Asón

From REFORM wiki
Revision as of 14:48, 8 April 2010 by Dgjalon (Talk | contribs)

Jump to: navigation, search

Biodiversity conservation and recovery in the river basin of Asón


Factsheet: Biodiversity conservation and recovery in the river basin of Asón

General
Country ES
River Name Asón
Site Name Biodiversity conservation and recovery in the river basin of Asón
River Characterisation
    River typology
    Location (Lat Lon) 43.3364781535722, -3.43048095703125
    Altitude mid-altitude: 200 - 800 m
    Catchment area medium: > 100 - 1000 km2
    Geology
    National code/
    River type name
    29 ejes fluviales principales cantabro-atlánticos calcáreos
    Hydromorphological quality elements

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size ha
    Approximate costs > 1 000 000 Euros
    Synergy Site of Community Importance Río Asón
    Status Realised
    Period of realization 1999 - 2004
    Evaluation
    Implemented by Fundación Naturaleza y Hombre


    Key features of the case study

    Site description

    The Ansón river source is located in the Collados del Asón Natural Park. It flows through habitats classified as of Community interest, including caves and rocks, peat bogs, beech and oak forests, Mediterranean holm-oak forests and gallery forests along its banks. These are the habitats of species of great interest such as Pyrenean musk rat, wolf, salmon and European bison. Downstream, where the waters from the river meet the sea, lie the Santoña salt marshes. This site is an important staging post on the migration route for hundreds of species of birds, which congregate there during the winter. Three sites representative of the valuable ecosystems along this river have been proposed for inclusion in the Natura 2000 network.

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

    Related Pressures