Olivenza. Hydrological and Forestry Restoration of the Olivenza riverside.
Olivenza. Hydrological and Forestry Restoration of the Olivenza riverside.
Key features of the case study
Site description
Measures selection
This should not figure here as a an ecological and hidromorphological restoration project. In fact, the project was design for flood protection, pursued by the construction of levees and weirs.
Some of the measures can improve the structure and composition of the riparian vegetation: silvicultural treatments (clearing, pruning), elimination of invasive species and plantation of native species.
To improve the hydraulic capacity of the river, as a way to prevent floodings, the woody debris have been removed from the channel, what can be considered an innapropiate measure, but understood if we consider the social context and the point of view of the farmers who cultivate at the floodplain. Also, 4.900 m3 of sediments were removed from the river channel.
The engineering measures considered for flood protection include transversal hydrological correction works, with the construction of five weirs (0,6 m height) and longitudinal spots over 550 m.
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References