Template factsheet
Contents
- 1 Site name:
- 2 Country
- 3 River Name
- 4 Site
- 5 Site Name
- 6 River typology
- 7 Biological quality elements
- 8 Pressures
- 9 Measures selection
- 10 Success criteria
- 11 Ecological response
- 12 Hydromorphological response
- 13 Monitoring before and after implementation of the project
- 14 Socio-economic aspects
- 15 Contact person within the organization
- 16 Extra background information
- 17 References
Site name:
Country
-> Select from list of countries of the world
River Name
Site
Site Name
River typology
- Location: Latitude and Longitude
- Altitude: select from WFD classification
- Catchment area: medium: > 100 - 1000 km2
- Geology Calcareous
==National code and River type name
==Hydromorphological quality elements
-> select from list of WFD: # Hydrological regime ## Quantity and dynamics of water flow ## Connection to groundwater bodies # River continuity ## River continuity # Morphological conditions ## River depth and width variation ## Structure and substrate of the river bed ## Structure of the riparian zone ## Structure of the floodplain
Biological quality elements
-> Select from list of WFD: # Phytoplankton # Macrophytes and phytobenthos # Benthic invertebrates # Fish
Pressures
-> Select from list:
01. Water abstractions
1.1 Surface water abstraction 1.2 Groundwater abstractions
02. Flow regulations
2.1 Discharge diversions and returns 2.2 Interbasin flow transfers 2.3 Hydrological regime modification 2.4 Hydropeaking 2.5 Reservoir flushing 2.6 Sediment discharge from dredging
03. River fragmentation
3.1 Artificial barriers upstream from the site 3.2 Artificial barriers downstream from the site 3.3 Colinear connected reservoir
04. Morphological alterations
4.1 Impoundment 4.2 Channelisation / cross section alteration 4.3 Alteration of riparian vegetation 4.4 Alteration of instream habitat 4.5 Embankments, levees or dikes 4.6 Sedimentation and sediment input 4.7 Sand and gravel extraction 4.8 Loss of vertical connectivity
05. Other hydromorphological pressures
5.1 Other pressures
Measures -- select from 01. Water flow quantity improvement
01.1 Reduce surface water abstraction without return 01.2 Reduce surface water abstraction with return 01.3 Improve water retention 01.4 Reduce groundwater extraction 01.5 Improve/Create water storage 01.6 Increase minimum flows 01.7 Water diversion and transfer 01.8 Recycle used water 01.9 Reduce water consumption
02. Sediment flow quantity improvement
02.1 Add/feed sediment 02.2 Reduce undesired sediment input 02.3 Prevent sediment accumulation in reservoirs 02.4 Reduce erosion 02.5 Improve continuity of sediment transport 02.6 Manage dams for sediment flow 02.7 Trap sediments
03. Flow dynamics improvement
03.1 Ensure minimum flows 03.2 Establish environmental flows / naturalise flow regimes 03.3 Modify hydropeaking 03.4 Increase flood frequency and duration in riparian zones or floodplains 03.5 Reduce anthropogenic flow peaks 03.6 Favour morphogenic flows 03.7 Shorten the length of impounded reaches 03.8 Link flood reduction with ecological restoration 03.9 Manage aquatic vegetation
04. Longitudinal connectivity improvement
04.1 Remove barrier 04.2 Install fish pass/bypass/side channel for upstream migration 04.3 Facilitate downstream migration 04.4 Modify culverts, syphons, piped streams 04.5 Manage sluice and weir operation for fish migration 04.6 Fish-friendly turbines and pumping stations
05. River bed depth and width variation improvement
05.1 Remeander water courses 05.2 Widen water courses 05.3 Shallow water courses 05.4 Allow/increase lateral channel migration or river mobility 05.5 Narrow water courses 05.6 Create low flow channels in over-sized channels
06. In-channel structure and substrate improvement
06.1 Initiate natural channel dynamics to promote natural regeneration 06.2 Remove sediments 06.3 Modify aquatic vegetation maintenance 06.4 Introduce large wood 06.5 Add sediments 06.6 Remove bank fixation 06.7 Recreate gravel bar and riffles 06.8 Remove or modify in-channel hydraulic structures 06.9 Reduce impact of dredging
07. Riparian zone improvement
07.1 Adjust land use to develop riparian vegetation 07.2 Revegetate riparian zones 07.3 Remove bank fixation 07.4 Remove non-native substratum 07.5 Adjust land use to reduce nutrient, sediment input or shore erosion 07.6 Develop riparian forest
08. Floodplains/off-channel/lateral connectivity habitats improvement
08.1 Lower river banks or floodplains to enlarge inundation and flooding 08.2 Set back embankments, levees or dikes 08.3 Reconnect backwaters and wetlands 08.4 Remove hard engineering structures that impede lateral connectivity 08.5 Restore wetlands 08.6 Retain floodwater 08.7 Improve backwaters 08.8 Construct semi-natural/articificial wetlands or aquatic habitats 08.9 Isolation of water bodies
09. Other aims to improve hydrological or morphological conditions
09.1 Other measures
Project size -1
Approximate costs select from < 10 000 Euros > 10 000 < 100 000 > 100 000 < 1 000 000 > 1 000 000
> 1 000 000 Euros
Synergy SCI of the Chícamo River (SCI ES6200028)
Status Realised
Period of realization 1/01/2005-31/12/2008
Evaluation -- select from Hydromorphological Ecological changes Hydromorphological and ecological changes None
Implemented by
-> Particular conditions of the site: size, river type, type of pressures, ecological status, etc.
Measures selection
-> Motivation/argumentation behind the selection of the measures implemented.
Success criteria
-> Brief description of the parameters used to assess the success of the project.
Ecological response
-> Brief description of observed effects of the measures over different types of organisms.
- Phytoplankton
- Macrophytes and phytobenthos
- Benthic Invertebrates
- Fish
- Other biota
Hydromorphological response
-> Brief description of observed effects of the measures over different hydromorphological elements.
- Hydrological regime
- River continuity
- Morphological conditions
Monitoring before and after implementation of the project
-> Brief description of available records and data ownership.
Socio-economic aspects
-> Brief description of socio-economic conditions in the site of the project and how the implementation of the project affects other ecosystem goods and services (e.g. recreation, water purification, flood protection, forestry, etc)
- Ecosystem goods and services:
- Conflicts and synergies:
- Project costs:
Contact person within the organization
-> Full name and email address of a person within the organisation that implemented the project who can provide more detailed information.
Extra background information
-> Any other information about the project can be listed here. Links can be made to other websites where the project is mentioned. Support documents can be uploaded (e.g. photos, pdf files).
References
-> Please acknowledge all sources of information used to write this wiki page.