Uilenkamp - Meander reconnection

From REFORM wiki
Revision as of 09:38, 21 June 2010 by Sven Teurlincx (Talk | contribs)

Jump to: navigation, search

Uilenkamp - Meander reconnection


Factsheet:

General
Country
River Name
Site Name
River Characterisation
    River typology
    Location (Lat Lon) ,
    Altitude
    Catchment area
    Geology
    National code/
    River type name

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size
    Approximate costs
    Synergy
    Status
    Period of realization
    Evaluation


    Key features of the case study

    Site description

    The Vecht river has served as a shipping route in the past. Nowadays it is no longer used for this commercial function. This has made it possible to go from a deep, straightened river to a more natural situation. A first step in this direction was taken by the local water authority with funding of the EU Interreg project. The site of Uilenkamp is a meander that was cut off at the start of the last century to make the Vecht river more suitable for navigation. The banks of the river were fixated and the channel straightened and deepened. This has led to an unnatural channel with relatively few chances for biota to flourish due to the lack of habitat diversity.

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

      No measures have been assigned to this project.

    Related Pressures

      No related pressures were found.