==Socio-economic aspects== | ==Socio-economic aspects== | ||
+ | ===Ecosystem goods and services=== | ||
+ | Not affected. | ||
+ | |||
+ | ===Conflicts and synergies=== | ||
+ | No conflicts or synergies are known. | ||
+ | |||
+ | ===Project costs=== | ||
+ | Unknown | ||
==Contact person within the organization== | ==Contact person within the organization== |
Revision as of 11:38, 14 June 2010
Klebach - Side channel
Key features of the case study
Site description
The Drava river (also known as Drau river in German) is a 6th order stream. At the project site, in the Upper Drava Valley, it forms the boundary between the Crystalline of the Central- and the Limestone Alps. The site of the project is located near the village of Klebach in Austria. From this point onward the Drava has a discharge basin of roughly 2500 km2. The average flow of the river near the site is 76m3/s. The river at the site was historically braided with gravel banks in the channel. The Drava river has been largely regulated from the 1930 onward in the area. Banks were fixated and meanders straightened out. Lateral connection with the floodplains and side arms was removed and these areas found new use as agricultural or forestry lands. In-channel gravel banks were removed artificially or through the changes in hydrology caused by the other alterations to the river. Downstream of the side a number of hydro-power plants were constructed, these significantly disrupted longitudinal connectivity of the river. At the same time these plants do produce 'green' energy for large parts of the surrounding areas.
Measures selection
The Waterauthority of the province of Carinthia in Austria, in an effort to restore some of the natural regime and ecology of the Drava, dug a side channel near the village of Klebach. This side channel was situated on the right hand side of the river in what was formerly agricultural land. On the left hand side groins were erected in hopes of keeping the entrance to the side channel open. Also, these groins were meant to initiate morphological variability in the river. The side channel itself was more then 300m in length and was originally build in two parts. This means that water was also able to enter/exit the channel about half way along it, creating what is best described as an artificial attempt at a braided river. The island that was created by the measure was the remainder of the old river bank with its old vegetation still intact.
Success criteria
The aims of the project were to:
- stop degradation
- initiate a changing river morphology
- diversify the spatial variability of flow velocity and sediment grain sizes
- restore an ecologically sound environment (in the form of habitat structures)
Ecological response
Macrophytes and phytobenthos
Not monitored
Benthic invertebrates
The benthic invertebrates were measured in the main and in the side channel. Due to lower shear stresses in the side channel the invertebrates had both higher population densities and species diversity than in the main channel. Part of this was also attributed to algal growth in the side channel which served as a habitat for the benthic invertebrates.
Fish
Fish species were shown to have significantly higher population densities in the side channel. The side channel was shown to serve as a hatching ground for many fish species. Also, two rheophilic fish species were found at the site, indicating it as an important spawning ground for rheophilic species. Despite these positive effects long term analysis has shown that the fish ecological status is still labelled as Poor by WFD standards. None the less, it has improved compared to the parts of the river where no restoration has taken place. One of the reasons for the Poor status of the area may be related to the scale of the measure compared to the pressures influencing the river. The downstream hydropeaking and longitudinal disruption of the connectivity remain unaltered by the local measure of the side channel.
Other biota
Vegetation
In one year the plant species diversity at the site increased from 48 species to 100 species. Another year later the species diversity had increased to 118 species in total. A form of stabilisation was taking place, likely caused by the gravel bars and islands being just above the average water table. This leads to disturbance during high water and floods, which in turn sets back the succession and thus keeps the system in a fairly pioneer-like succession stage. None the less, the measure has increased the plant diversity in the area.
Birds
A total of 40 different bird species were observed in the area; 8 of these are red-list species in Austria. The birds primarily use the gravel bars and the vegetation structures on it for resting and eating. This type of habitat is largely absent in the surrounding area, making it attractive for birds that pass through the area.
Hydromorphological response
Hydrological regime
The hydrology of the site has not been monitored specifically. However, the digging of a side channel has the obvious effect of taking part of the flow from the main channel and directing it into the side channel. Also, small changes in flow speed at the project site can be expected.
River continuity
Unaffected
Morphological conditions
Due to the lack of bank fixation morphological processes have been partially restored. During normal flow aggradation of the side channel and banks occurred. However, during high flow the groins on the left side of the banks weren't capable of forcing the line of major flow to the side channel. This in turn has led to a degradation of the channel which leads to a preservation of aggradation of roughly 50%. This means that there is a net sedimentation in the channel, as was the aim of the project. The grain size in the main channel has been unaffected. At local scale the grain size in both the side channel and between the groins has shown variability.
Monitoring before and after implementation of the project
Pre-project monitoring has been absent in the area. Instead, space-for-time substitutes were used to discover the effect of the measure. Either the main, or nearby unrestored reaches of the channel were used as pre-restoration reference conditions. Most of the short term investigations on the site were carried out by the Institute for Water Management, Hydrology and Hydraulic Engineering seated at the University for Natural Resources of Vienna. From 1999 to 2003 data on fish was collected at the site for a LIFE+ EU project.
Socio-economic aspects
Ecosystem goods and services
Not affected.
Conflicts and synergies
No conflicts or synergies are known.
Project costs
Unknown
Contact person within the organization
Wasserwirtschaft Kärnten e-mail, Tel.: 050 536-31802 (Austria)
Extra background information
References
Related Measures
- Increase flood frequency and duration in riparian zones or floodplains
- Shorten the length of impounded reaches
- Remove bank fixation
- Recreate gravel bar and riffles
- Remove or modify in-channel hydraulic structures
- Remove bank fixation
- Reconnect backwaters and wetlands
- Construct semi-natural/articificial wetlands or aquatic habitats