Difference between revisions of "El Ruedo"

From REFORM wiki
Jump to: navigation, search
(This is a river Jarama restoration project on a reach that was affected by an abandoned gravel pit.)
m (Reverted edits by Uvebogytiw (Talk) to last version by 138.100.124.166)
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Media:Jarama_Restoration2001.pdf]]=El Molar =
+
Restoration in the Jarama river at the locality El Molar.
 +
An abandoned gravel pit was restored by designing the alternative channel close to the natural river bed. ==
 +
[[Media:Jarama_Restoration2001.pdf]]=El Molar
  
 
<googlemap version="0.9" lat="40.6972339347745" lon="-3.54300498962402" zoom="15" scale="yes" overview="yes" controls="large"> </googlemap>  
 
<googlemap version="0.9" lat="40.6972339347745" lon="-3.54300498962402" zoom="15" scale="yes" overview="yes" controls="large"> </googlemap>  

Latest revision as of 13:04, 24 November 2010

Restoration in the Jarama river at the locality El Molar. An abandoned gravel pit was restored by designing the alternative channel close to the natural river bed. == Media:Jarama_Restoration2001.pdf=El Molar


Factsheet: El Molar

General
Country ES
River Name Jarama
Site Name El Molar
River Characterisation
{{{rivertypes}}}
River typology
Location (Lat Lon) 40.6972339347745, -3.54300498962402
Altitude mid-altitude: 200 - 800 m
Catchment area large: > 1000 - 10000 km2
Geology Siliceous
National code/
River type name
12

Biological quality elements
{{{bqe}}}
Ecosystem Services
{{{egands}}}
EU Directives
{{{eedandp}}}
Pressures
Point source pollution
Organic siltation
Water abstractions
Water abstraction
Morphological alterations
Channelisation/Cross section alteration
Measures
Working with physical form and function of river and floodplains
Use of engineering techniques to assist natural recovery
Reconnect and restore historic aquatic habitats
Recreation of gravel bars and riffles
Bank reprofilling
Habitat creation
Introduce riparian vegetation/green corridors
Other
Project size 24 ha
Approximate costs 300000
Synergy -
Status Realised
Period of realization 2003
Evaluation Yes