Difference between revisions of "Rijkelse Bemden - River bed widening"

From REFORM wiki
Jump to: navigation, search
(New page: =Rijkelse Bemden - River bed widening= <googlemap version="0.9" lat="51.2620222720018" lon="6.01020812988281" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" contr...)
 
(Socio-economic aspects)
Line 22: Line 22:
  
 
==Socio-economic aspects==
 
==Socio-economic aspects==
 +
===Ecosystem goods & services===
 +
Gravel, sand and clay mining (historical).
 +
 +
===Synergies and conflicts===
 +
The project was carried out to increase the room for the river and thereby improve flood protection during high discharges. At the same time the clay and sand that was taken from the river bed widening was used in the banks of the Rijkelse Bemden. Locally it was also used to shallow the ponds in the area.
 +
 +
===Costs===
 +
The total project of the river bed widening and restoration of the Rijkelse Bemden was estimated to cost 13 million euro.
  
 
==Contact person within the organization==
 
==Contact person within the organization==

Revision as of 09:38, 24 June 2010

Rijkelse Bemden - River bed widening


Key features of the case study

Site description

Measures selection

Success criteria

Ecological response

Hydromorphological response

Monitoring before and after implementation of the project

Socio-economic aspects

Ecosystem goods & services

Gravel, sand and clay mining (historical).

Synergies and conflicts

The project was carried out to increase the room for the river and thereby improve flood protection during high discharges. At the same time the clay and sand that was taken from the river bed widening was used in the banks of the Rijkelse Bemden. Locally it was also used to shallow the ponds in the area.

Costs

The total project of the river bed widening and restoration of the Rijkelse Bemden was estimated to cost 13 million euro.

Contact person within the organization

Extra background information

References


Related Measures

Related Pressures