Difference between revisions of "Hondsbroeksche Pleij – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)"
From REFORM wiki
(New page: =Hondsbroeksche Pleij – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)= <googlemap version="0.9" lat="52.3755991766591" lon="5.625" zoom="13" width="100%...) |
(No difference)
|
Revision as of 13:00, 19 July 2011
Hondsbroeksche Pleij – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)
Key features of the case study
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Improve water retention
- Improve/Create water storage
- Increase flood frequency and duration in riparian zones or floodplains
- Link flood reduction with ecological restoration
- Lower river banks or floodplains to enlarge inundation and flooding
- Set back embankments, levees or dikes
- Retain floodwater
- Construct semi-natural/articificial wetlands or aquatic habitats