Restoration in the Jarama river at the locality El Molar.
An abandoned gravel pit was restored by designing the alternative channel close to the natural river bed. ==
Media:Jarama_Restoration2001.pdf=El Molar
Working with physical form and function of river and floodplains Use of engineering techniques to assist natural recovery Reconnect and restore historic aquatic habitats Recreation of gravel bars and riffles Bank reprofilling Habitat creation Introduce riparian vegetation/green corridors