Oberwerries - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)
From REFORM wiki
Oberwerries - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)
Key features of the case study
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Increase flood frequency and duration in riparian zones or floodplains
- Link flood reduction with ecological restoration
- Initiate natural channel dynamics to promote natural regeneration
- Remove bank fixation
- Adjust land use to develop riparian vegetation
- Revegetate riparian zones
- Remove bank fixation
- Remove non-native substratum
- Lower river banks or floodplains to enlarge inundation and flooding
- Restore wetlands
- Retain floodwater
- Improve backwaters
- Construct semi-natural/articificial wetlands or aquatic habitats