Negro

From REFORM wiki
Revision as of 12:58, 14 April 2010 by Dgjalon (Talk | contribs)

Jump to: navigation, search

Negro


Factsheet:

General
Country
River Name
Site Name
River Characterisation
    River typology
    Location (Lat Lon) ,
    Altitude
    Catchment area
    Geology
    National code/
    River type name
    Hydromorphological quality elements

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size
    Approximate costs
    Synergy
    Status
    Period of realization
    Evaluation


    Key features of the case study

    • The ecological improvement of the Negro river is part of a national river restoration programme, Estrategia Nacional de Restauración de Ríos, developed by the Ministerio de Ministerio de Medio Ambiente, y Medio Rural y Marino (Ministry of Environment). The Confederación Hidrográfica del Duero is the organism which has implemented this project, as others of the Duero basin.
    • The principal objective of this initiative is to restore trout populations and the naiad Margaritifera margaritifera, which is in serious danger of extinction.
    • The main threat to these species is the presence of weirs that make difficult or impossible the migration of the trouts upstream,which are the propagation vector of the naiads, affecting their reproduction.

    Site description

    The Negro river drains the the area located at the south of Sierra de la Cabrera, of siliceous substrate (gneiss, slate and quartzite). The climate is meaditerranean with atlantic influence.
    The total or partial removal of riparian vegetation at some reaches has caused the loss of natural channel morphology. The transformation of the riparian forest and floodplain into flood meadows is another reason of morphological alteration.
    There are various impoundments at the river for different uses(mills, forges, irrigation pipes,etc.)increasing the solids contribution and the interrupting the longitudinal connectivity.

    Negro river
    Presence of transversal barriers at the channel.

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

      No measures have been assigned to this project.

    Related Pressures

      No related pressures were found.