Klebach - Side channel
From REFORM wiki
Revision as of 15:02, 10 June 2010 by Sven Teurlincx (Talk | contribs)
Klebach - Side channel
Key features of the case study
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Wasserwirtschaft Kärnten e-mail, Tel.: 050 536-31802 (Austria)
Extra background information
References
Related Measures
- Increase flood frequency and duration in riparian zones or floodplains
- Shorten the length of impounded reaches
- Remove bank fixation
- Recreate gravel bar and riffles
- Remove or modify in-channel hydraulic structures
- Remove bank fixation
- Reconnect backwaters and wetlands
- Construct semi-natural/articificial wetlands or aquatic habitats