Difference between revisions of "Renaturierung Untere Havel"
From REFORM wiki
												
																		
						|  (→Site description) |  (→Contact person within the organization) | ||
| Line 23: | Line 23: | ||
| ==Socio-economic aspects== | ==Socio-economic aspects== | ||
| − | + | project information and downloads at http://www.nabu.de/themen/fluesse/gewaesserrandstreifenprojektunterehavelniederung/ | |
| + | project leader Rocco Buchta | ||
| + | Projektbüro Untere Havelniederung | ||
| + | Ferdinand-Lassalle-Str. 10 | ||
| + | 14712 Rathenow | ||
| ==Extra background information== | ==Extra background information== | ||
Latest revision as of 13:16, 9 April 2010
Renaturierung Untere Havel
 
Key features of the case study
core area of measures 8900 ha along a 90 km river stretch, total area of planning unit 18 700 ha
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
project information and downloads at http://www.nabu.de/themen/fluesse/gewaesserrandstreifenprojektunterehavelniederung/ project leader Rocco Buchta Projektbüro Untere Havelniederung Ferdinand-Lassalle-Str. 10 14712 Rathenow
Extra background information
References
Related Measures
- Improve water retention
- Increase minimum flows
- Ensure minimum flows
- Establish environmental flows / naturalise flow regimes
- Increase flood frequency and duration in riparian zones or floodplains
- Install fish pass/bypass/side channel for upstream migration
- Shallow water courses
- Allow/increase lateral channel migration or river mobility
- Narrow water courses
- Initiate natural channel dynamics to promote natural regeneration
- Remove bank fixation
- Remove bank fixation
- Lower river banks or floodplains to enlarge inundation and flooding
- Set back embankments, levees or dikes
- Reconnect backwaters and wetlands
- Remove hard engineering structures that impede lateral connectivity
- Improve backwaters