Remove hard engineering structures that impede lateral connectivity

From REFORM wiki
Jump to: navigation, search

Remove hard engineering structures that impede lateral connectivity

Category 08. Floodplains/off-channel/lateral connectivity habitats improvement

General description

Applicability

Expected effect of measure on (including literature citations):

  • HYMO (general and specified per HYMO element)
  • physico � chemical parameters
  • Biota (general and specified per Biological quality elements)

Temporal and spatial response

Pressures that can be addressed by this measure

Cost-efficiency

Case studies where this measure has been applied

Useful references

Other relevant information