Difference between revisions of "Vallacuera ravine. Removal of a dyke."
(→Key features of the case study) |
(→Site description) |
||
Line 15: | Line 15: | ||
==Site description== | ==Site description== | ||
− | [[Image:Vallacuera.jpg|center|General situation of Vallacuera gully before the actuation]] | + | The ravine is of great ecological importance since acts as a corridor between the dry steppes located upstream and the fluvial ecosystem. The floodplain restored will be an important transitional area were Mediterranean species dependent on regular floods will develop.<br /> |
+ | [[Image:Vallacuera.jpg|center|General situation of Vallacuera gully before the actuation]] | ||
+ | |||
==Measures selection== | ==Measures selection== | ||
Revision as of 16:13, 18 May 2010
Vallacuera ravine. Removal of a dyke.
Key features of the case study
The dike built in the 80’s after the canalization works carried out in Arga River was removed to recover the natural floodplain in one of the tributaries’ confluence: Vallacuera stream.
The main objective of this project is to restore the river Arga natural floodplain by removing the dyke and increasing the fluvial territory.
There are other secondary objectives: to increase the quality of habitat in Community Interest Areas, with special attention to European mink (Mustela lutreola); creating new habitats for otter (Lutra lutra) and European turtle (Emys orbicularis); quality improvement of habitats 92A0 (willow and black poplar plantation) and 92D0 (tamarisk plantation); spatial planning for cattle.
Site description
The ravine is of great ecological importance since acts as a corridor between the dry steppes located upstream and the fluvial ecosystem. The floodplain restored will be an important transitional area were Mediterranean species dependent on regular floods will develop.
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Project costs
The total costs of the entire project 138.840,25€
Contact person within the organization
Fernando Mendoza, e-mail
Gestión Ambiental Viveros y Repoblaciones de Navarra, S.A.
Padre Adoain, 219 bajo
31015 Pamplona - Navarra
Fax: (00 34) 948 38 23 91
Extra background information
References
http://www.life-gerve.com/eng/portal/index.asp
Related Measures
- Link flood reduction with ecological restoration
- Develop riparian forest
- Remove hard engineering structures that impede lateral connectivity
- Adjust land use to develop riparian vegetation
- Revegetate riparian zones
- Remove bank fixation
- Construct semi-natural/articificial wetlands or aquatic habitats