Difference between revisions of "Renaturierung Untere Havel"
From REFORM wiki
(→Site description) |
(→Contact person within the organization) |
||
Line 23: | Line 23: | ||
==Socio-economic aspects== | ==Socio-economic aspects== | ||
− | + | project information and downloads at http://www.nabu.de/themen/fluesse/gewaesserrandstreifenprojektunterehavelniederung/ | |
+ | project leader Rocco Buchta | ||
+ | Projektbüro Untere Havelniederung | ||
+ | Ferdinand-Lassalle-Str. 10 | ||
+ | 14712 Rathenow | ||
==Extra background information== | ==Extra background information== |
Latest revision as of 13:16, 9 April 2010
Renaturierung Untere Havel
Key features of the case study
core area of measures 8900 ha along a 90 km river stretch, total area of planning unit 18 700 ha
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
project information and downloads at http://www.nabu.de/themen/fluesse/gewaesserrandstreifenprojektunterehavelniederung/ project leader Rocco Buchta Projektbüro Untere Havelniederung Ferdinand-Lassalle-Str. 10 14712 Rathenow
Extra background information
References
Related Measures
- Improve water retention
- Increase minimum flows
- Ensure minimum flows
- Establish environmental flows / naturalise flow regimes
- Increase flood frequency and duration in riparian zones or floodplains
- Install fish pass/bypass/side channel for upstream migration
- Shallow water courses
- Allow/increase lateral channel migration or river mobility
- Narrow water courses
- Initiate natural channel dynamics to promote natural regeneration
- Remove bank fixation
- Remove bank fixation
- Lower river banks or floodplains to enlarge inundation and flooding
- Set back embankments, levees or dikes
- Reconnect backwaters and wetlands
- Remove hard engineering structures that impede lateral connectivity
- Improve backwaters