Difference between revisions of "Enns - Aich"
(→Key features of the case study) |
(→Site description) |
||
Line 12: | Line 12: | ||
==Site description== | ==Site description== | ||
+ | |||
+ | The river Enns has its source in the Radstädter Tauern Mountains in the Austrian federal state of Salzburg. The Enns continues its flow across the federal states Styria and Upper Austria where it joins the Danube after 254 km. At the project site the Enns valley forms the border between the Limestone Alps in the north and the Grauwackenzone in the south. The sub-catchment size is about 800 km² and the average annual flow 21,5 m³/s. Before regulation measures took place on the river Enns this river section was influenced by two tributaries. The high bed load input of the tributaries formed alluvial cones which lead to an increasing slope downstream. The combination of increased slope and high bed load input created locally a braiding river character with gravel banks, vegetated islands and sequences of cut- and slip-off banks. | ||
+ | |||
+ | ==Drivers and Pressures== | ||
+ | |||
+ | In the middle of the 19th century the regulation of the river Enns started aiming the expansion of agricultural land use and settlement areas. The river course in the Enns valley was shortened by 18%. 37 meander bends were cut off and the river was straightened. Due to drainage measures in the valley bottom many swamps fell dry. Additionally the Enns and their tributaries are used also for hydropower production. | ||
+ | |||
+ | ==Global objectives== | ||
+ | |||
+ | After heavy flood events in August 2002 plans for a 100 years flood protection for the municipality of Aich were initiated. The aim was to realize an ecological orientated river compatible flood protection programme. | ||
+ | |||
+ | ==Specific goals== | ||
+ | |||
+ | *100 years flood protection for the settlement area | ||
+ | *Conservation and improvement of ecological status | ||
+ | *Maintenance and creation of retention areas | ||
+ | *Orientation on potential river type | ||
==Measures selection== | ==Measures selection== |
Revision as of 13:23, 12 February 2014
Enns - Aich
Key features of the case study
As part of the “flood protection programme for the Upper Enns River” ecological orientated measures were implemented at the river Enns in the village Aich. Besides several technical measures like a flood protection dam the river bed was widened in two sections both as retention area and for ecological benefits. Bank stabilization structures were removed and for this reason lateral erosion increased and the development of gravel bars was initialized. A new side arm was created which offers diverse instream structures and many different habitat types.
Site description
The river Enns has its source in the Radstädter Tauern Mountains in the Austrian federal state of Salzburg. The Enns continues its flow across the federal states Styria and Upper Austria where it joins the Danube after 254 km. At the project site the Enns valley forms the border between the Limestone Alps in the north and the Grauwackenzone in the south. The sub-catchment size is about 800 km² and the average annual flow 21,5 m³/s. Before regulation measures took place on the river Enns this river section was influenced by two tributaries. The high bed load input of the tributaries formed alluvial cones which lead to an increasing slope downstream. The combination of increased slope and high bed load input created locally a braiding river character with gravel banks, vegetated islands and sequences of cut- and slip-off banks.
Drivers and Pressures
In the middle of the 19th century the regulation of the river Enns started aiming the expansion of agricultural land use and settlement areas. The river course in the Enns valley was shortened by 18%. 37 meander bends were cut off and the river was straightened. Due to drainage measures in the valley bottom many swamps fell dry. Additionally the Enns and their tributaries are used also for hydropower production.
Global objectives
After heavy flood events in August 2002 plans for a 100 years flood protection for the municipality of Aich were initiated. The aim was to realize an ecological orientated river compatible flood protection programme.
Specific goals
- 100 years flood protection for the settlement area
- Conservation and improvement of ecological status
- Maintenance and creation of retention areas
- Orientation on potential river type
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Improve water retention
- Increase flood frequency and duration in riparian zones or floodplains
- Link flood reduction with ecological restoration
- Remove barrier
- Widen water courses
- Initiate natural channel dynamics to promote natural regeneration
- Introduce large wood
- Remove bank fixation
- Recreate gravel bar and riffles
- Adjust land use to develop riparian vegetation
- Revegetate riparian zones
- Remove bank fixation
- Lower river banks or floodplains to enlarge inundation and flooding
- Reconnect backwaters and wetlands