Difference between revisions of "Narew river restoration project"
(Created page with "=Narew river restoration project= <googlemap version="0.9" lat="53.141317" lon="22.878147" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="l...") |
(→Key features of the case study) |
||
Line 8: | Line 8: | ||
==Key features of the case study== | ==Key features of the case study== | ||
+ | |||
+ | The Narew river restoration project concentrates on the area of the buffer zone of Narew National Park (NPN). NPN was created in 1996. Narew valley between Suraż village and Żółtki village (area of the NPN and its buffer zone) was fully natural area until implementation of hydrotechnical works that were carried out in the Narew valley from 1960 until 1980. Prior the regulation, the Narew river was of anastomosing character along entire length of this stretch. The main aim of the restoration project was protection of environment in Marshy Valley of the Narew (Natura 2000 site code PLB200001) with a special consideration of hydrological conditions and integrated program of economic development. The work proceeded in stages and focuses on restoring an anastomosing system of Narew river downstream of the NPN in its buffer zone. | ||
==Site description== | ==Site description== |
Revision as of 11:26, 27 May 2014
Narew river restoration project
Key features of the case study
The Narew river restoration project concentrates on the area of the buffer zone of Narew National Park (NPN). NPN was created in 1996. Narew valley between Suraż village and Żółtki village (area of the NPN and its buffer zone) was fully natural area until implementation of hydrotechnical works that were carried out in the Narew valley from 1960 until 1980. Prior the regulation, the Narew river was of anastomosing character along entire length of this stretch. The main aim of the restoration project was protection of environment in Marshy Valley of the Narew (Natura 2000 site code PLB200001) with a special consideration of hydrological conditions and integrated program of economic development. The work proceeded in stages and focuses on restoring an anastomosing system of Narew river downstream of the NPN in its buffer zone.
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Improve/Create water storage
- Increase minimum flows
- Improve water retention
- Water diversion and transfer
- Reduce erosion
- Improve continuity of sediment transport
- Increase flood frequency and duration in riparian zones or floodplains
- Manage aquatic vegetation
- Establish environmental flows / naturalise flow regimes
- Remove barrier
- Widen water courses
- Allow/increase lateral channel migration or river mobility
- Modify aquatic vegetation maintenance
- Initiate natural channel dynamics to promote natural regeneration
- Remove sediments
- Remove or modify in-channel hydraulic structures
- Develop riparian forest
- Adjust land use to develop riparian vegetation
- Adjust land use to reduce nutrient, sediment input or shore erosion
- Remove hard engineering structures that impede lateral connectivity