Difference between revisions of "Set back embankments, levees or dikes"

From REFORM wiki
Jump to: navigation, search
(New page: =Set back embankments, levees or dikes= Set back embankments, levees or dikesFloodplains/off-channel/lateral connectivity habitats improvement ==General description == ==Applicability =...)
 
Line 1: Line 1:
 
 
=Set back embankments, levees or dikes=
 
=Set back embankments, levees or dikes=
  
Set back embankments, levees or dikesFloodplains/off-channel/lateral connectivity habitats improvement
+
Set back embankments, levees or dikes08. Floodplains/off-channel/lateral connectivity habitats improvement
 
==General description ==
 
==General description ==
  
Line 19: Line 18:
 
==Other relevant information ==
 
==Other relevant information ==
  
[[Category:Measures]][[Category:Floodplains/off-channel/lateral connectivity habitats improvement]]
+
[[Category:Measures]][[Category:08. Floodplains/off-channel/lateral connectivity habitats improvement]]

Revision as of 14:00, 18 March 2010

Set back embankments, levees or dikes

Set back embankments, levees or dikes08. Floodplains/off-channel/lateral connectivity habitats improvement

General description

Applicability

Expected effect of measure on (including literature citations):

  • HYMO (general and specified per HYMO element)
  • physico � chemical parameters
  • Biota (general and specified per Biological quality elements)

Temporal and spatial response

Pressures that can be addressed by this measure

Cost-efficiency

Case studies where this measure has been applied

Useful references

Other relevant information