Difference between revisions of "Remove bank fixation"

From REFORM wiki
Jump to: navigation, search
Line 1: Line 1:
 
 
=Remove bank fixation=
 
=Remove bank fixation=
  
Remove bank fixationRiparian zone improvement
+
Remove bank fixation06. In-channel structure and substrate improvement
 
==General description ==
 
==General description ==
  
Line 12: Line 11:
 
==Temporal and spatial response  ==
 
==Temporal and spatial response  ==
 
==Pressures that can be addressed by this measure ==
 
==Pressures that can be addressed by this measure ==
<Forecasterlink type="getPressuresForMeasures" code="M53" />
+
<Forecasterlink type="getPressuresForMeasures" code="M43" />
 
==Cost-efficiency ==
 
==Cost-efficiency ==
 
==Case studies where this measure has been applied ==
 
==Case studies where this measure has been applied ==
<Forecasterlink type="getProjectsForMeasures" code="M53" />
+
<Forecasterlink type="getProjectsForMeasures" code="M43" />
 
==Useful references ==
 
==Useful references ==
 
==Other relevant information ==
 
==Other relevant information ==
  
[[Category:Measures]][[Category:Riparian zone improvement]]
+
[[Category:Measures]][[Category:06. In-channel structure and substrate improvement]]

Revision as of 13:20, 18 March 2010

Remove bank fixation

Remove bank fixation06. In-channel structure and substrate improvement

General description

Applicability

Expected effect of measure on (including literature citations):

  • HYMO (general and specified per HYMO element)
  • physico � chemical parameters
  • Biota (general and specified per Biological quality elements)

Temporal and spatial response

Pressures that can be addressed by this measure

Cost-efficiency

Case studies where this measure has been applied

Useful references

Other relevant information