Töss
From REFORM wiki
Revision as of 09:39, 27 May 2014 by Benjamin Kupilas (Talk | contribs)
Töss
Key features of the case study
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Establish environmental flows / naturalise flow regimes
- Facilitate downstream migration
- Remove barrier
- Widen water courses
- Allow/increase lateral channel migration or river mobility
- Remeander water courses
- Initiate natural channel dynamics to promote natural regeneration
- Remove sediments
- Remove bank fixation
- Remove or modify in-channel hydraulic structures
- Lower river banks or floodplains to enlarge inundation and flooding
- Remove hard engineering structures that impede lateral connectivity
- Construct semi-natural/articificial wetlands or aquatic habitats
- Set back embankments, levees or dikes