Category:Measures

From REFORM wiki
Revision as of 12:18, 29 April 2010 by Admin (Talk | contribs)

Jump to: navigation, search

Aims & Measures

River continuity.jpg

[1]
For example:

  • Aim: Longitudinal connectivity improvement
  • Measure: Installation of a fish pass

River restoration and rehabilitation projects are implemented to achieve given objectives aiming at improving hydromorphological and/or ecological conditions in the river system. The methods or activities used to achieve these Aims are usually called Measures.

Sixty restoration and rehabilitation measures have been selected for the analysis based on information compiled from the River Basin Management Plans of the countries represented in the FORECASTER consortium and information provided by the Environment Agency of England and Wales[2].

The measures have been organized according to their aims into the 9 measure groups indicated below as Subcategories. Click in the subcategory to see the measures contained in it. The complete list of measures is presented at the bottom of the page under Pages in category "Measures"

References:

  1. Environmental Issues, Dams and Fish migration. Neste River, France
  2. Royal Haskoning. 2007. Hydromorphology and the Water Framework Directive, Work package 6 of the Environment Agency WFD Hydromorphology Project


Pages in category "Measures"

The following 61 pages are in this category, out of 61 total.

A

C

D

E

F

I

I cont.

L

M

N

O

P

R

R cont.

S

T

W